Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. Which of the following has been adjudged as the cleanest railway station in category A1, as per recently released report by the Ministry of Railways?
    A)Secunderabad
    B)Vishakhapatnam
    C)Jammu Tawi
    D)Anand ViharTerminal
    Answer: Vishakhapatnam
  • Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
    A)139
    B)144
    C)123
    D)119
    Answer: 139
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
    A)800 Meter
    B)1200 Meter
    C)1000 Meter
    D)500 Meter
    Answer: 800 Meter
  • Q. How many members did the railway board had?
    A)4
    B)3
    C)5
    D)8
    Answer: 4
  • Q. Loss of Railway property of ________ is treated as serious accident.
    A)75 Lakhs
    B)More than 50 lakhs
    C)01 crore
    D)More than 02 crore
    Answer: More than 02 crore
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. When the rail failure is rectified by the train can pass at speed
    A)30 kmph
    B)20 kmph
    C)25 kmph
    D)None of these
    Answer: 30 kmph
  • Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
    A)South Western Railway
    B)North Eastern Railway
    C)South Central Railway
    D)North Central Railway
    Answer: South Central Railway
  • Q. Second train during TSL will be dispatched after ________.
    A)Both
    B)Line clear
    C)Without line clear
    D)None of these
    Answer: Line clear
  • Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
    A)Call-on Signal
    B)Fixed stop signal
    C)Hand Signal
    D)None of these
    Answer: Fixed stop signal
  • Q. Speed of train when whistle becomes defective is ________ km/h.
    A)45/8
    B)30/8
    C)25/8
    D)40/8
    Answer: 25/8
  • Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Second
  • Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
    A)Madhya Pradesh
    B)Tamil Nadu
    C)West Bengal
    D)Punjab
    Answer: West Bengal
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. DRM nominates ________ for each section to issue caution orders to train crew.
    A)Nil notice
    B)Caution notice station
    C)Notice
    D)None of these
    Answer: Caution notice station
  • Q. Number of train signal register of single line is ________.
    A)T/166 B
    B)T/136 A
    C)T/137 B
    D)T/135
    Answer: T/137 B
  • Q. Intermediate Block home will be provided only on ________ Line.
    A)Triple
    B)Single
    C)Double
    D)None of these
    Answer: Single
  • Q. Which of the following zones administers the Matheran Hill Railway?
    A)Central Railways
    B)Konkan Railways
    C)Western Railways
    D)Southern Railways
    Answer: Central Railways
  • Q. 2 states of North East India will be connected through Broad Gauge. They are:
    A)Meghalaya and Assam
    B)Manipur and Meghalaya
    C)Mizoram and Manipur
    D)Mizoram and Arunachal Pradesh
    Answer: Mizoram and Manipur