More Questions on Indian Railway
- Q. Indian Railway Act means ________.
A)Part 23 of 1989
B)Part 22 of 1989
C)Part 24 of 1989
D)Part 21 of 1989
Answer: Part 24 of 1989
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. A platform surrounded by rail lines from all the four sides, is called
A)Island platform
B)Dock platform
C)Passenger platform
D)Goods platform
Answer: Island platform
- Q. Distant signal shows ________ light in normal condition in double distant signalling is provided.
A)Three yellow
B)One Yellow
C)Two yellow
D)Four yellow
Answer: Two yellow
- Q. Indian Railways which is the largest of the Public Sector Enterprises, is divided in how many regions?
A)8
B)7
C)9
D)10
Answer: 9
- Q. EMU trains of harbour line has ________ number of wooden wedges.
A)6
B)2
C)4
D)8
Answer: 4
- Q. Which of the following is the largest marshalling yard in India (also the longest in Asia)?
A)Itarsi
B)Mughalsarai
C)Mathura
D)Guntakal
Answer: Mughalsarai
- Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
A)0000-000
B)000000-0000 0
C)00000-0
D)0000-0000
Answer: 000000-0000 0
- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. Fly shunting will take place in
A)Flat Yard
B)Hump Yard
C)Gravity Yard
D)None of these
Answer: Hump Yard
- Q. When was the first train steamed off in India?
A)1875
B)1848
C)1853
D)1880
Answer: 1853
- Q. Consider the following initiative with Ministries associated to them: 1)Project Swarna – Ministry of Railways 2)Project CHAMAN – Ministry of Agriculture 3)Project DARPAN – Ministry of Communications Which of the above is/are correct?
A)Only 1 & 3
B)Only 1 & 2
C)Only 2 & 3
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Information of caution notice stations is given in ________.
A)Both A or B
B)WTT
C)Working time table
D)None of these
Answer: Both A or B
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. Material train is a ________ train.
A)Both
B)Departmental
C)Permanent
D)None of these
Answer: Departmental
- Q. During failure of signals and communications in DL automatic area the authority to proceed is
A)T/B 912
B)T/D 912
C)T/A 912
D)None of these
Answer: T/B 912
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. Yearly coaching stock census is taken on ________.
A)31st January
B)31st December
C)31st October
D)31st March
Answer: 31st October
- Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
A)25 kmph
B)50 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
A)650
B)700
C)725
D)760
Answer: 760
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State