- Q. D class stations are called as ________.
A)Station Limit
B)Halt Station
C)Class station
D)None of these
Answer: Halt Station
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. The speed of lorry shall not exceed
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. S mark on the EMU coach means ________.
A)Scroll
B)Release
C)Spare
D)None of these
Answer: Spare
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
A)3 man
B)02 man
C)04 man
D)None of these
Answer: 04 man
- Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 2
- Q. Special instructions are issued by ________.
A)Both
B)COM
C)Sr. DOM
D)None of these
Answer: COM
- Q. On which of the following is the longest railway bridge in India located?
A)River Brahmaputra
B)River Ganges
C)Vembanad Lake
D)Chilka Lake
Answer: River Brahmaputra
- Q. At station which signal will be taken off for block line?
A)Shut
B)Repeating
C)Calling on
D)No Signal
Answer: No Signal
- Q. Second train during all communication failure shall be dispatched after an interval of
A)35
B)20
C)25
D)30
Answer: 30
- Q. Joint sighting committee shall inspect the visibility of signals once in
A)6 months
B)A month
C)3 months
D)None of these
Answer: 3 months
- Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
A)15 km
B)8 km
C)10 km
D)20 km
Answer: 15 km
- Q. During prolonged failure of signals in automatic section, ________ authority is issued.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
A)DOM
B)AOM(G)
C)AOM(Chg)
D)None of these
Answer: AOM(G)
- Q. In automatic block system SL, the signal that can be dispensed with is
A)Automatic Stop signal
B)Home
C)Starter
D)None of these
Answer: Automatic Stop signal
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. How much minimum BP pressure is reduce to require to apply brake in a goods train?
A)1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
B)Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
C)1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
D)
Answer: Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
- Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A)Both
B)Red Light
C)Green Light
D)None of these
Answer: Red Light