- Q. IN the BD Spl, the water must be filled ________.
A)Three Week
B)Once a week
C)Two week
D)None of these
Answer: Once a week
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. If any Loco pilot leave from his duty place without to informed to his supervisor, it is treated as?
A)A & B both
B)Absent from his duty
C)Indiscipline
D)None of these
Answer: Absent from his duty
- Q. Signal has extinguished.
A)------00
B)___0___
C)0___0
D)00___
Answer: ------00
- Q. In automatic block system SL, the signal that can be dispensed with is
A)Automatic Stop signal
B)Home
C)Starter
D)None of these
Answer: Automatic Stop signal
- Q. Which of the following is the largest zone in terms of route kilometers?
A)Northern Railways
B)Western Railways
C)Eastern Railways
D)Southern Railways
Answer: Northern Railways
- Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
A)1500 meters
B)200 meters
C)1000 meters
D)2000 meters
Answer: 1000 meters
- Q. For a passenger carrying train to stop with a few passengers vehicles beyond platform, it must be permitted by
A)DOM
B)DSO
C)DRM
D)None of these
Answer: DRM
- Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley
B)Tower wagon
C)Ladder Trolley
D)None of these
Answer: Tower wagon
- Q. How many officers may be attached with light engine?
A)1
B)2
C)3
D)None of these
Answer: 3
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. Which of the gauges is used in the hilly areas?
A)Narrow gauge
B)Broad gauge
C)Meter gauge
D)Special gauge
Answer: Narrow gauge
- Q. To protect his train, Guard must first proceed ________ meters in rear and place one detonator in BG in absolute block system.
A)1200
B)600
C)800
D)None of these
Answer: 600
- Q. Where is the wheel and axle plant of Indian Railways situated?
A)Bangalore
B)Chittranjan
C)Kapurthala
D)Perambur
Answer: Bangalore
- Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section
B)Station diary
C)Diary
D)None of these
Answer: Station diary
- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. ________ is measured with the help of anemometer.
A)Both
B)Wind
C)Velocity
D)None of these
Answer: Both
- Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
A)50
B)50
C)40
D)60
Answer: 60
- Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
A)Both
B)Outer Most facing Points
C)Inner Most facing signal
D)None of these
Answer: Outer Most facing Points
- Q. Corridor block is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT