Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. ________ is measured with the help of anemometer.
    A)Both
    B)Wind
    C)Velocity
    D)None of these
    Answer: Both
  • Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
    A)15
    B)20
    C)25
    D)30
    Answer: 30
  • Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
    A)Receive on loop line
    B)Run through from station
    C)Receive of Main line
    D)None of these
    Answer: Run through from station
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
    A)1, 2 & 3
    B)1 Only
    C)1 & 2 Only
    D)None
    Answer: 1, 2 & 3
  • Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
    A)80
    B)70
    C)75
    D)85
    Answer: 75
  • Q. By whom the rear portion of train left behind in block section protected?
    A)By engineearing official
    B)By Guard
    C)By LP
    D)No need to protect the load
    Answer: By Guard
  • Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
    A)Counter circuit
    B)Track circuit/axle counter
    C)Circuit
    D)None of these
    Answer: Track circuit/axle counter
  • Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
    A)01 month
    B)04 month
    C)02 month
    D)03 Months
    Answer: 02 month
  • Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
    A)Gate opened and point is not set for main line
    B)Gate closed and point is set for main line
    C)Gate opened and point is set for main line
    D)Defective signal
    Answer: Defective signal
  • Q. Derailment will come under accident class ________.
    A)C
    B)A
    C)B
    D)D
    Answer: D
  • Q. What is the speed of second train on double line section running on T/A602?
    A)10 kmph
    B)20 kmph
    C)15 kmph
    D)8 kmph
    Answer: 8 kmph
  • Q. Tower wagon shall run as per the rules of working of ________.
    A)Passengers
    B)Wagon
    C)Train
    D)None of these
    Answer: Train
  • Q. Danger zone in 1500 DC traction is ________ meters from OHE.
    A)3
    B)1
    C)2
    D)4
    Answer: 1
  • Q. On which place the Guard should be presented at the time of train backed from one running line to another line?
    A)In Break van
    B)At Facing point
    C)On Engine
    D)At Anyplace
    Answer: In Break van
  • Q. P marker is provided for a
    A)Semaphore warner
    B)Colour light distance
    C)Semaphore distant
    D)None of these
    Answer: Colour light distance
  • Q. In case of ACP, Guard of EMU shall give ________ bell.
    A)0-00-00
    B)00-00-00
    C)00-0-00
    D)000-0-00
    Answer: 00-0-00
  • Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
    A)16
    B)20
    C)12
    D)10
    Answer: 16
  • Q. When four wheeler attached, speed of passenger train will be ________ km/h.
    A)85
    B)80
    C)75
    D)90
    Answer: 75
  • Q. Ruling gradient of the division is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT