Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. How many officers may be attached with light engine?
    A)1
    B)2
    C)3
    D)None of these
    Answer: 3
  • Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
    A)20
    B)25
    C)15
    D)None of these
    Answer: 25
  • Q. Motorman shall give ________ beat to release the hand brakes.
    A)00-00-00
    B)00-0-00
    C)0-0-0
    D)0-00-00
    Answer: 00-0-00
  • Q. How an automatic stop signal can be recognized?
    A)Eliminated A marker
    B)A marker on white disk
    C)No mark
    D)Four aspects
    Answer: A marker on white disk
  • Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. The length of long welded rail under Indian conditions should be about
    A)0.50 km
    B)1 km
    C)2 km
    D)None of these
    Answer: 1 km
  • Q. Target time for dispatch of ARME from single exit siding at night is ________ minutes.
    A)8
    B)10
    C)5
    D)25
    Answer: 25
  • Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
    A)2
    B)1.5
    C)1
    D)None of these
    Answer: 1.5
  • Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
    A)Both
    B)Track Circuit
    C)Track
    D)None of these
    Answer: Track Circuit
  • Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. At which of the following places Diesel Component Works is established?
    A)Perambur
    B)Jamshedpur
    C)Patiala
    D)Varanasi
    Answer: Patiala
  • Q. Caution order is carried forward at stations on Monday at ________ hours.
    A)12:00
    B)10:00
    C)11:00
    D)09:00
    Answer: 09:00
  • Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. Which state has the longest route (in kilometers) of railway line in India?
    A)Rajasthan
    B)Maharashtra
    C)Andhra Pradesh
    D)Uttar Pradesh
    Answer: Uttar Pradesh
  • Q. Speed of the last train during ACF on double line is ________ km/h.
    A)20/15/Walking
    B)25/10/Walking
    C)20/10/Walking
    D)None of these
    Answer: 25/10/Walking
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. Shatabdi Express train was started in ________.
    A)1990
    B)1984
    C)1988
    D)1985
    Answer: 1988