Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. In automatic block system SL, the signal that can be dispensed with is
    A)Automatic Stop signal
    B)Home
    C)Starter
    D)None of these
    Answer: Automatic Stop signal
  • Q. 400 meters beyond the home signal of a C’ class station is called as ________.
    A)Last stop signal
    B)Block section
    C)Overlapping block section
    D)None of these
    Answer: Overlapping block section
  • Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
    A)30
    B)20
    C)25
    D)15
    Answer: 15
  • Q. What will be maximum speed during shunting of goods train?
    A)25 kmph
    B)8 kmph
    C)15 kmph
    D)30 kmph
    Answer: 15 kmph
  • Q. Station working rules of an interlocked station is prepared by Sr. DOM and ________.
    A)Sr. DSTE
    B)DOM
    C)COM
    D)None of these
    Answer: Sr. DSTE
  • Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
    A)Received train
    B)Train Divided
    C)Thorugh train
    D)None of these
    Answer: Train Divided
  • Q. Form number of disconnection and reconnection is ________.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
    A)10
    B)20
    C)30
    D)None of these
    Answer: 10
  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. After how many time train shall be protected by Guard in rear if 1st stop signal found in On position?
    A)15 minutes
    B)10 minutes
    C)5 minutes
    D)No need
    Answer: 15 minutes
  • Q. If the driver does not receive all right signal from the guard, he must call by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short
    D)None of these
    Answer: Two sharp whistles
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
    A)RailSilver
    B)RailSagar
    C)RailCloud
    D)RailBharat
    Answer: RailCloud
  • Q. How many hooters shall be used for ART at the time of accident of a goods train outside the HQ.
    A)4
    B)2
    C)3
    D)5
    Answer: 3
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. The first Shatabdi express was introduced between which of the following locations?
    A)New Delhi and Jhansi
    B)Bombay and Thane
    C)Bombay and Kolkata
    D)New Delhi and Chennai
    Answer: New Delhi and Jhansi
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
    A)600 meters
    B)400 meters
    C)500 meters
    D)800 meters
    Answer: 600 meters
  • Q. Station Master shall give line clear with ________ while granting line clear.
    A)Calling-on
    B)Shunt signal
    C)Private No.
    D)None of these
    Answer: Private No.
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000

Leave a Comment