Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. Stop signal is to be passed in On position.
    A)T-806
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(3b)
  • Q. Speed of the following tower wagon is ________ km/h.
    A)9
    B)10
    C)8
    D)4
    Answer: 8
  • Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. Maximum No. of ________ track machines can be sent for working in a block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. In case of block forward, private number of ________ station is written on shunting authority.
    A)T/809
    B)T/806
    C)T/809
    D)T/810
    Answer: T/806
  • Q. Station section available in which Class of Station?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: B-Class
  • Q. If the IBS signal is ON and Telephone is defective, Loco Pilot shall wait for 5 minutes and proceed at a speed of ________
    A)15/6
    B)15/8
    C)15/4
    D)15/2
    Answer: 15/8
  • Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Which year is declared as “Year of Rail Users” by the Indian Railways?
    A)1996
    B)2000
    C)1995
    D)1997
    Answer: 1995
  • Q. The validity of BCC is for ________ years
    A)01 years
    B)03 years
    C)02 years
    D)None of these
    Answer: 03 years
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
    A)Warner, Home
    B)Outer, Home
    C)Distant, Home
    D)Distant, Home, Starter
    Answer: Distant, Home
  • Q. What is the name of the first train of Indian Railways handed over to private players for operation?
    A)Karnataka Express
    B)Tejas Express
    C)Shatabdi Express
    D)Duronto Express
    Answer: Tejas Express
  • Q. When was the nationalization of Indian Railways done?
    A)1951
    B)1952
    C)1950
    D)1954
    Answer: 1950
  • Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
    A)One long
    B)Three long
    C)Short one long
    D)None of these
    Answer: Three long
  • Q. Loss of railway property of Rs. more than 2 Crores is treaed as ________ accident.
    A)Both
    B)Minor
    C)Serious
    D)None of these
    Answer: Serious
  • Q. Maximum permissible speed is fixed by ________.
    A)MT
    B)CRS
    C)GM
    D)None of these
    Answer: CRS
  • Q. BSLB determines the limits of Station section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. In how many zones Indian Railway has been divided?
    A)17
    B)14
    C)16
    D)20
    Answer: 17
  • Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
    A)15
    B)20
    C)25
    D)30
    Answer: 30

Leave a Comment