Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
    A)30
    B)20
    C)25
    D)15
    Answer: 15
  • Q. Rajasthan is under which of the following railway zones?
    A)North - Western region
    B)Northern region
    C)Western region
    D)Central Region
    Answer: North - Western region
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6
  • Q. What will be the prescribed form for DMT Block?
    A)E/223
    B)T/409
    C)T/806
    D)E/233
    Answer: E/223
  • Q. Duplicate signal is ________.
    A)Co-acting signal
    B)Home Signal
    C)Warner Signal
    D)None of these
    Answer: Co-acting signal
  • Q. Signal that controls the entry of trains into the block section in advance is called as
    A)Last Stop signal
    B)Fisrt Stop signal
    C)Stop signal
    D)None of these
    Answer: Last Stop signal
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. Trap indicator is provided to indicate ________.
    A)Provision Switch
    B)Indication Switch
    C)Derailing switch
    D)None of these
    Answer: Derailing switch
  • Q. Indian Railways has launched an integrated mobile app “Rail Saarthi” for railway passengers. What does “Saarthi” stands for?
    A)Synchronous Advanced Application Rail Travel Help and Information
    B)Synergised Advanced Application Rail Travel Help and Information
    C)Synchronic Advanced Application Rail Travel Help and Information
    D)Synergic Advanced Application Rail Travel Help and Information
    Answer: Synergised Advanced Application Rail Travel Help and Information
  • Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
    A)8
    B)10
    C)6
    D)None of these
    Answer: 6
  • Q. If the points are set for main line, point indicator gives ________ light in the night.
    A)Yellow
    B)red
    C)Green
    D)White
    Answer: White
  • Q. Station working rules of an interlocked station is prepared by Sr. DOM and ________.
    A)Sr. DSTE
    B)DOM
    C)COM
    D)None of these
    Answer: Sr. DSTE
  • Q. Loco pilot shall not take alcoholic drinks before ________ hours from signing on duty.
    A)8
    B)5
    C)4
    D)10
    Answer: 8
  • Q. The monies in the National Investment Fund can be used for ________: 1. Recapitalization of public sector banks 2. Purchasing the shares of CPSEs 3. Towards operating expenses of Indian Railways 4. Social Overheads such as building schools, toilets etc. Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1, 2 & 3
    C)Only 2, 3 & 4
    D)Only 1 & 2
    Answer: Only 1 & 2
  • Q. ________ tail board will be used is EMU train.
    A)Turn Over & Turn Flow
    B)Turnover
    C)Turn Flow
    D)None of these
    Answer: Turnover
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. Signals are normally located to the ________ side of the line.
    A)Both
    B)Right
    C)Left
    D)None of these
    Answer: Left
  • Q. The speed of Engine on Baharline is ________ kmph
    A)16
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. What is the length of North-Eastern Frontier Railway (NFR)?
    A)4290 km
    B)4300 km
    C)3700 km
    D)5298 km
    Answer: 3700 km
  • Q. When a driver passing an automatic gate stop signal at ‘ON’ he must stop short of the gate of
    A)25 meters
    B)30 meters
    C)45 meters
    D)None of these
    Answer: None of these