- Q. When was the construction work for the first Railway line Started?
A)1823
B)1821
C)1828
D)1830
Answer: 1821
- Q. Hand shunting outside section in gradient ________ is prohibited except with DRM permission.
A)ST 1-800
B)ST 1-600
C)ST 1-700
D)None of these
Answer: ST 1-600
- Q. How an automatic stop signal can be recognized?
A)Eliminated A marker
B)A marker on white disk
C)No mark
D)Four aspects
Answer: A marker on white disk
- Q. Distance between outer and home signals on a single line is ________ meters when there is no advanced starter or SLB in the opposite direction.
A)400
B)900
C)800
D)700
Answer: 400
- Q. Signals are normally located to the ________ side of the line.
A)Both
B)Right
C)Left
D)None of these
Answer: Left
- Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912
B)TA-912
C)TB-912
D)TC-1425
Answer: TA-912
- Q. Goods warning board will be provided from FSS in BG at
A)560 meters
B)1400 meters
C)1000 meters
D)None of these
Answer: 1400 meters
- Q. The speed of Engine on Baharline is ________ kmph
A)16
B)10
C)15
D)None of these
Answer: 10
- Q. How many members did the railway board had?
A)4
B)3
C)5
D)8
Answer: 4
- Q. Who has been appointed as the new Chairman of Railway Board?
A)P S Thakur
B)V K Yadav
C)A K Mittal
D)Neelmani Reddy
Answer: V K Yadav
- Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3
B)1
C)2
D)None of these
Answer: 3
- Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. The number of line clear ticket in up direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/B 1425
Answer: T/C 1425
- Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
A)Hand
B)Outer
C)Call-On
D)Non eof these
Answer: Outer
- Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
A)White light left and right
B)Green light up and down
C)Green light left and right
D)Green light without any movement
Answer: Green light left and right
- Q. What will be the maximum speed in Loop Line at B-Class standard-III interlocked station?
A)50 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 15 kmph
- Q. What type of speed restriction imposed for loco pilot when at LC gate communication not available between Gateman & Station Master ?
A)8 kmph
B)15 kmph
C)10 kmph
D)Normal
Answer: 10 kmph
- Q. Warner signal is of ________ shape in TALQ signalling system.
A)Both
B)Fish Tailed
C)Long
D)None of these
Answer: Fish Tailed
- Q. Colour of the semaphore distant signal is ________.
A)Yellow
B)Red
C)White
D)Green
Answer: Yellow
- Q. On which authority advance starter may be passed during shunting operation in its on position?
A)On hand signal
B)T-369(3b)
C)Written memo
D)T-806
Answer: T-806