Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. India’s first rail auto hub will be located in:
    A)Delhi
    B)Kolkata
    C)Chennai
    D)New Delhi
    Answer: Chennai
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. What will be the prescribed form for DMT Block?
    A)E/223
    B)T/409
    C)T/806
    D)E/233
    Answer: E/223
  • Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
    A)15 kmph
    B)25 kmph
    C)20 kmph
    D)None of these
    Answer: 25 kmph
  • Q. Shunt signal is placed below any stop signal except ________.
    A)Stop Signal
    B)First stop signal
    C)Last Stop signal
    D)None of these
    Answer: First stop signal
  • Q. P marker is provided for a
    A)Semaphore warner
    B)Colour light distance
    C)Semaphore distant
    D)None of these
    Answer: Colour light distance
  • Q. BSLB determines the limits of block section and ________ .
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
    A)Both
    B)Red Light
    C)Green Light
    D)None of these
    Answer: Red Light
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. Caution order is carried forward at stations on Monday at ________ hours.
    A)12:00
    B)10:00
    C)11:00
    D)09:00
    Answer: 09:00
  • Q. When a running line is occupied ________ entry must be made in TSR.
    A)Yellow Ink
    B)Red Ink
    C)Green Ink
    D)None of these
    Answer: Red Ink
  • Q. On which of the following is the longest railway bridge in India located?
    A)River Brahmaputra
    B)River Ganges
    C)Vembanad Lake
    D)Chilka Lake
    Answer: River Brahmaputra
  • Q. If warner signal of any station becomes defective in off condition, ________ is issued to Loco Pilot from the station in rear.
    A)Verbally
    B)Walkie-Talkie
    C)Written Memo
    D)None of these
    Answer: Written Memo
  • Q. What is maximum width for 8-Wheeled Goods stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3050 mm
  • Q. The following bell signal is prescribed between driver and guard to indicates ‘passing’ automatic signal at ON.
    A)Four
    B)Three
    C)Two
    D)None of these
    Answer: Two
  • Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
    A)30 kmph
    B)25 kmph
    C)60 kmph
    D)Normal speed
    Answer: 60 kmph
  • Q. Metro Railway is functioning in which of the following Indian States?
    A)West Bengal
    B)Gujarat
    C)Maharashtra
    D)Tamil Nadu
    Answer: West Bengal
  • Q. Block competency certificate is given in the prescribed form ________.
    A)T/115A
    B)T/115B
    C)T/115C
    D)T/115D
    Answer: T/115B
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. Which is the least signalto be installed on C class stations in multiple aspect signalling?
    A)Warner, Home
    B)Outer, Home
    C)Distant, Home
    D)Distant, Home, Starter
    Answer: Distant, Home