- Q. Speed of train when whistle becomes defective is ________ km/h.
A)45/8
B)30/8
C)25/8
D)40/8
Answer: 25/8
- Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm
B)60 mm
C)70 mm
D)50 mm
Answer: 50 mm
- Q. For work of long duration, the stop indicator must be erected at not less than
A)40
B)30
C)50
D)45
Answer: 30
- Q. Which marker is available in repeating signal?
A)P-Marker
B)G-Marker
C)C-Marker
D)R-Marker
Answer: R-Marker
- Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
A)North Korea
B)Japan
C)South Korea
D)China
Answer: Japan
- Q. After the detonator explodes if Driver does not find any signal he can proceed upto ________ Km cautiously
A)2
B)1.5
C)1
D)None of these
Answer: 1.5
- Q. To start the train from a line with common starter, ________ authority is issued.
A)T/512
B)T/516
C)T/517
D)T/511
Answer: T/512
- Q. Where is the Research, Design and Standard Organization situated?
A)Pune
B)Lucknow
C)Bangalore
D)New Delhi
Answer: Lucknow
- Q. Hand shunting of vehicles is prohibited in gradient
A)1 - 400 or steeper
B)1 - 260
C)1 - 400
D)None of these
Answer: 1 - 400 or steeper
- Q. Shunting restrictions of station is written in ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: SWR
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. The headquarters of the South Central Railway zone is located in?
A)Hyderabad
B)Kolkata
C)Secunderabad
D)Gorakhpur
Answer: Secunderabad
- Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00
B)000-000
C)00-00
D)000-000-000
Answer: 000-000
- Q. In case of defective head light, ________ bell code is given on block instrument to the station in advance.
A)000000-000
B)00000-0
C)000000-0
D)0000-00
Answer: 000000-0
- Q. When was the North – Eastern frontier Railway (NEFR) established?
A)2nd Jan, 1956
B)15th Jan, 1958
C)15th Jan, 1955
D)14th April, 1952
Answer: 15th Jan, 1958
- Q. Form number of disconnection and reconnection is ________.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph
B)20 kmph
C)25 kmph
D)None of these
Answer: 30 kmph
- Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
A)1000 meters
B)400 meters
C)600 meters
D)None of these
Answer: 600 meters
- Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
A)Central India Railway
B)Bombay Baroda Railway
C)The Scindia Railway
D)Great Indian Peninsula Railway
Answer: Great Indian Peninsula Railway
- Q. What action should be taken by LP while observed Abnormal jurk in Ist block section of IBS?
A)If he failed to inform to SM, protection of the portion by Guard
B)Inform to SM through IBP phone
C)Check his train
D)All of above
Answer: All of above