Q. Colour of the semaphore shunt signal is ________.

Correct Answer

Red

More Questions on Indian Railway

  • Q. Rake link book-let is prepared by COM and ________.
    A)DPO
    B)CPTM
    C)CPO
    D)None of these
    Answer: CPTM
  • Q. All automatic stop signals will have ________ marker plate.
    A)G
    B)B
    C)A
    D)None of these
    Answer: A
  • Q. The Driver of goods train must stop his train as close as possible to ________.
    A)Both
    B)Starter
    C)Advance Starter
    D)None of these
    Answer: Starter
  • Q. Motor Trolley permit is ________
    A)T/1625
    B)T/1425
    C)T/1525
    D)None of these
    Answer: T/1525
  • Q. The headquarters of Northern Railway is at
    A)Gorakhpur
    B)New Delhi
    C)Guwahati
    D)Mumbai (CST)
    Answer: New Delhi
  • Q. At which of the following places steam engines were originally manufactured by Indian Railway ?
    A)Chittranjan
    B)Varanasi
    C)Perambur
    D)Patiala
    Answer: Chittranjan
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. Joint sighting committee shall inspect the visibility of signals once in
    A)6 months
    B)A month
    C)3 months
    D)None of these
    Answer: 3 months
  • Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
    A)15
    B)10
    C)20
    D)40
    Answer: 15
  • Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
    A)1000 meters
    B)400 meters
    C)600 meters
    D)None of these
    Answer: 600 meters
  • Q. Station Working Rules of Non-interlocked station is signed by ________.
    A)AOM & ADEN
    B)DOM & DEN
    C)Sr. DOM & Sr. DEN
    D)None of these
    Answer: Sr. DOM & Sr. DEN
  • Q. The height of standards used as supports in open trucks loaded with fire wood bamboo etc, shall not exceed the following in BG from the floor of wagon.
    A)1 - 890 meters
    B)1 - 98 meters
    C)1 - 830 meters
    D)None of these
    Answer: 1 - 98 meters
  • Q. How many hooters shall be used for ART at the time of accident of a goods train outside the HQ.
    A)4
    B)2
    C)3
    D)5
    Answer: 3
  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. In context with the Indian railways what is TPWS?
    A)Train Protection Warning Stopper
    B)Train Passenger Warning System
    C)Train Protection Warning System
    D)Transmission Protection warning Stopper
    Answer: Train Protection Warning System
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. Point indicator shows ________ light when the points are set for loop line.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)