Q. Colour of the semaphore shunt signal is ________.

Correct Answer

Red

More Questions on Indian Railway

  • Q. The Ministry of Railways has recently launched which app for freight managers?
    A)SNOORTI app
    B)SFOORTI app
    C)SKOORTI app
    D)SMOORTI app
    Answer: SFOORTI app
  • Q. Colour of the semaphore distant signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
    A)30
    B)10
    C)20
    D)None of these
    Answer: 30
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. In the classification of A to R accidents, ________ and ‘o’ classes are not included.
    A)Both
    B)Minor
    C)Serious
    D)None of these
    Answer: Serious
  • Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
    A)10
    B)7
    C)9
    D)15
    Answer: 7
  • Q. Warning boards for neutral section shall be fixed at a distance of
    A)300 and 600 meters
    B)400 and 600 meters
    C)500 and 250 meters
    D)None of these
    Answer: 500 and 250 meters
  • Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
    A)15 kmph
    B)8 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. What should be done by guard if train entering in block section without authority to proceed?
    A)Protect the Train
    B)Stop the Train
    C)Inform to SM
    D)All of above
    Answer: All of above
  • Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
    A)8
    B)3
    C)5
    D)10
    Answer: 3
  • Q. for the purpose of shunting is gradient the steeper gradient for Roller bearing vehicle is
    A)ST 1-260
    B)ST 1-400
    C)1-400 or sleeper
    D)None of these
    Answer: 1-400 or sleeper
  • Q. Fog signal man must be on ________ Hrs duty.
    A)5
    B)3
    C)4
    D)None of these
    Answer: 3
  • Q. Termination indication board will be
    A)Rectangular
    B)Square
    C)Round
    D)None of these
    Answer: Round
  • Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
    A)Walkie-Talkie
    B)Walkie
    C)VHF
    D)None of these
    Answer: Walkie-Talkie
  • Q. When was the new Harbour rail line inaugurated?
    A)1931
    B)1925
    C)1928
    D)1933
    Answer: 1925
  • Q. What will be the maximum speed to pass IBS home signal in ON position when received authority from previous station?
    A)8 kmph
    B)15 kmph
    C)10 kmph
    D)Normal
    Answer: Normal
  • Q. With respect to ‘Operating ratio’ in Railways, which of the following statement is/are correct? 1)The higher is the ‘Operating Ratio’; the better is the economic condition of railways. 2) ‘Operating ratio’ of Indian Railways is high on account of social service obligation imposed in Budget. Select the correct option from the codes given below
    A)Both 1 & 2
    B)Only 1
    C)Only 2
    D)Neither 1 nor 2
    Answer: Only 2
  • Q. Which road suburban railway station in Mumbai has been rechristened as Prabhadevi station?
    A)Churchgate
    B)Boisar
    C)Andheri
    D)Elphinstone
    Answer: Elphinstone
  • Q. BSLB determines the limits of block section and ________ .
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section

Leave a Comment