Q. Colour of the semaphore shunt signal is ________.
A
Green
B
Red
C
Yellow
D
None of these
Correct Answer
Red
More Questions on Indian Railway
Q. How many officers may be attached with light engine?
A)1 B)2 C)3 D)None of these
Answer: 3
Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912 B)TA-912 C)TB-912 D)TC-1425
Answer: TA-912
Q. When an accident occurs the GDR must their report to next SM in form.
A)ACC5 B)ACC1 C)ACC2 D)ACC3
Answer: ACC3
Q. What will be maximum speed during shunting of goods train?
A)25 kmph B)8 kmph C)15 kmph D)30 kmph
Answer: 15 kmph
Q. Which city is hosting the International Conference on Green Initiatives & Railway Electrification?
A)Guwahati B)Kochi C)Chennai D)New Delhi
Answer: New Delhi
Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
A)3 man B)02 man C)04 man D)None of these
Answer: 04 man
Q. With which country did India sign the Joint Declaration of Intent (JDI) to strengthen the cooperation on strategic projects in the field of Railways?
A)Germany B)Sweden C)Russia D)Italy
Answer: Germany
Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25 B)20 C)15 D)None of these
Answer: 25
Q. Normally the train with hot axle is admitted on ________.
A)Main Line B)Loop Line C)Siding Line D)None of these
Answer: Main Line
Q. Competency certificate of the gateman of interlocked engineering gate is signed by
A)Both B)SSE/P.way C)SSE/Sig. D)None of these
Answer: Both
Q. If the train passes through without headlight, SM shall give ________ bell code and advise the reason.
A)0000-0 B)000000-0 C)00000-0 D)0000-00
Answer: 000000-0
Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
A)ST 1-260 B)ST 1-600 C)1-400 D)None of these
Answer: ST 1-600
Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow B)RED C)Green D)None of these
Answer: RED
Q. The speed of shunting is ________.
A)10 kmph B)15 kmph C)20 kmph D)None of these
Answer: 15 kmph
Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph B)25 kmph C)60 kmph D)Normal speed
Answer: 60 kmph
Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
A)RailSilver B)RailSagar C)RailCloud D)RailBharat
Answer: RailCloud
Q. When a stream engine is running tender foremost the speed shall not exceed ________.
A)30 kmph B)40 kmph C)20 kmph D)None of these
Answer: 40 kmph
Q. For work of long duration, the stop indicator must be erected at not less than
A)40 B)30 C)50 D)45
Answer: 30
Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
A)650 B)700 C)725 D)760
Answer: 760
Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below: