Q. Colour of the semaphore shunt signal is ________.
A
Green
B
Red
C
Yellow
D
None of these
Correct Answer
Red
More Questions on Indian Railway
Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
A)Only 2 & 3 B)Only 1 C)Only 1 & 2 D)Only 3
Answer: Only 3
Q. The number of private number sheet is ________.
A)T/99 D B)T/99 F C)T/99 A D)T/99 E
Answer: T/99 F
Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10 B)7 C)9 D)15
Answer: 7
Q. Target time for ARME from double exit siding is?
Q. In case of ACP, Assistant Loco Pilot shall proceed towards the rear from ________ side.
A)Back B)Left C)Right D)Noe of these
Answer: Right
Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third B)First C)Second D)None of these
Answer: Third
Q. For work of long duration, the stop indicator must be erected at not less than
A)40 B)30 C)50 D)45
Answer: 30
Q. Second train during TSL will be dispatched after ________.
A)Both B)Line clear C)Without line clear D)None of these
Answer: Line clear
Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg B)6 kg C)10 kg D)None of these
Answer: 7 - 10 kg
Q. The maximum speed of a train while passing through station of interlocking std III is?
A)140 kmph B)50 kmph C)110 kmph D)160 kmph
Answer: 140 kmph
Q. For imposition of line block application must be sent ________ Hours in advance.
A)18 B)24 C)12 D)22
Answer: 24
Q. Who has been appointed as the new Union Minister of Railways?
A)Ashwini Vaishnaw B)Piyush Goyal C)Nirmala Sitharaman D)Mukhtar Abbas Naqvi
Answer: Ashwini Vaishnaw
Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6 B)8 C)4 D)10
Answer: 8
Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
A)01 month B)04 month C)02 month D)03 Months
Answer: 02 month
Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
A)Both B)PN C)Non-PN D)None of these
Answer: PN
Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph B)Normal speed C)15 kmph D)60 kmph
Answer: 60 kmph
Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC B)A Class/IBS C)C Class/IBS D)None of these
Answer: C Class/IBS
Q. Maximum permissible speed is fixed by ________.
A)MT B)CRS C)GM D)None of these
Answer: CRS
Q. When a passenger carrying train is working with engine running tender foremost the speed is ________ if cow catcher and head light is not provided.
A)15 kmph B)25 kmph C)20 kmph D)None of these
Answer: 20 kmph
Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.
A)150 meters B)200 meters C)180 meters D)None of these