More Questions on Indian Railway
- Q. Traffic gates are those located between ________.
A)First signal
B)Outermost stop signal
C)Stop signal
D)None of these
Answer: Outermost stop signal
- Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?
A)Sutlej
B)Chenab
C)Jhelum
D)Indus
Answer: Chenab
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. The first officer of the ________ department to arrive or present shall be responsible for the marshaling of the BD Special.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical
- Q. Where is RDSO Situated.
A)Chennai
B)Vadodara
C)Lucknow
D)New Delhi
Answer: Lucknow
- Q. BP in the Guard cab of EMU shall be ________ kg/cm2 and Motor mans cab shall be 4.6 kg/cm2.
A)4
B)4.2
C)4.01
D)4.6
Answer: 4.6
- Q. Track maintenance machine is permitted to work during
A)Day clear weather
B)Day
C)Day and Night
D)None of these
Answer: Day and Night
- Q. Speed of second train during temporary single line working is ________.
A)Both
B)Normal
C)Abnormal
D)None of these
Answer: Normal
- Q. Rajasthan is under which of the following railway zones?
A)North - Western region
B)Northern region
C)Western region
D)Central Region
Answer: North - Western region
- Q. Loss of railway property of Rs. more than 2 Crores is treaed as ________ accident.
A)Both
B)Minor
C)Serious
D)None of these
Answer: Serious
- Q. A station where the rail lines end, is called
A)Block station
B)Junction station
C)Way - side station
D)Terminal station
Answer: Terminal station
- Q. Where is the Indian Railways Institute of Civil Engineering Institute situated?
A)Nasik
B)Pune
C)Chennai
D)Secunderabad
Answer: Pune
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. Length of BOXN Wagon is
A)10.71 meters
B)8.67 meters
C)9.78 meters
D)None of these
Answer: 10.71 meters
- Q. What is the speed of A class ODC in BG?
A)40 kmph
B)15 kmph
C)25 kmph
D)Normal speed
Answer: Normal speed
- Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
A)3
B)1
C)2
D)4
Answer: 2
- Q. Number of the caution order is ________
A)T/410
B)T/409
C)T/408
D)None of these
Answer: T/409
- Q. Between which place station section is situated at double class B station, equipped with MACLS?
A)FP to LSS
B)Home signal to Ad starter
C)BSLB to Ad. Starter
D)A or B any one
Answer: BSLB to Ad. Starter
- Q. Signal failure advised to the driver through the station in rear will be inform
A)T/369(3b)
B)T/369
C)T/370
D)None of these
Answer: T/369
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State