- Q. The extended life of Detonator is ________ Years.
A)4
B)5
C)6
D)10
Answer: 10
- Q. Depot in-charge is responsible to test the detonators once in ________.
A)Year
B)Monthly
C)Weekly
D)None of these
Answer: Year
- Q. W/L board will be provided at not less than ________ metres from the gate.
A)600
B)400
C)500
D)800
Answer: 600
- Q. During single line working on double line in automatic area the speed of all train running in wrong direction shall not exceed
A)10 kmph
B)25 kmph
C)15 kmph
D)None of these
Answer: 25 kmph
- Q. Passenger warning board is placed at a distance of ________ meters from the first stop signal.
A)1500
B)1200
C)1000
D)1800
Answer: 1000
- Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
A)4
B)2
C)3
D)6
Answer: 2
- Q. Train is to be started from non signalled line
A)T/D 602
B)T-511
C)T-512
D)Simple memo
Answer: T-511
- Q. Shunt signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: First stop signal
- Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
A)4 2 1 3
B)1 2 3 4
C)1 2 4 3
D)3 1 4 2
Answer: 4 2 1 3
- Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. For imposition of line block application must be sent ________ Hours in advance.
A)18
B)24
C)12
D)22
Answer: 24
- Q. Signal sighting committee shall submit its report on form ________.
A)T/101 B
B)T/103 B
C)T/102 B
D)None of these
Answer: T/102 B
- Q. Amount of vaccum level required in high speed train loco is
A)56 cm
B)50 cm
C)55 cm
D)None of these
Answer: 56 cm
- Q. For block forwarded form ________ must be issued.
A)Both
B)T/806+LSSS
C)T/608
D)None of these
Answer: T/806+LSSS
- Q. The monies in the National Investment Fund can be used for ________: 1. Recapitalization of public sector banks 2. Purchasing the shares of CPSEs 3. Towards operating expenses of Indian Railways 4. Social Overheads such as building schools, toilets etc. Select the correct option from the codes given below:
A)Only 1, 2 & 4
B)Only 1, 2 & 3
C)Only 2, 3 & 4
D)Only 1 & 2
Answer: Only 1 & 2
- Q. Overloading Tolerance for a 8 wheeler bogie MG vehicle is
A)1.5 Tonne
B)2 Tonnes
C)1 Tonne
D)None of these
Answer: 1 Tonne
- Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
A)Both
B)Red Light
C)Green Light
D)None of these
Answer: Red Light
- Q. Moped trolley / Scooter trolley treated as ________.
A)Motor Trolley
B)Push Trollies
C)Trolley
D)None of these
Answer: Motor Trolley
- Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
A)25
B)20
C)15
D)30
Answer: 25
- Q. During thick or foggy weather or night if ________ is not provided, trains are not permitted to draw ahead upto advanced starter.
A)Both
B)Track Circuit
C)Track
D)None of these
Answer: Track Circuit