Q. A material train may be divided outside station limit during emergency under the supervision of ________.

Correct Answer

PWI

More Questions on Indian Railway

  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of FP pressure in the engine.
    A)3
    B)5
    C)2
    D)4
    Answer: 5
  • Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below:
    A)Only 1, 2 & 4
    B)Only 1 & 2
    C)Only 1, 2 & 3
    D)1, 2, 3 & 4
    Answer: Only 1, 2 & 4
  • Q. TSL is started between those two stations at which cross over facility are available and
    A)D Class/IBC
    B)A Class/IBS
    C)C Class/IBS
    D)None of these
    Answer: C Class/IBS
  • Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. For Temporary diversions, the permission must be obtained from
    A)CE
    B)CRS
    C)Railway Board
    D)None of these
    Answer: Railway Board
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15
  • Q. Block competency certificate is issued by ________.
    A)AOM
    B)Principal ZRTI
    C)SM
    D)None of these
    Answer: Principal ZRTI
  • Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
    A)T/C-912
    B)T/B-912
    C)T/D-912
    D)None of these
    Answer: T/D-912
  • Q. The maximum speed of a train while passing through station of interlocking std III is?
    A)140 kmph
    B)50 kmph
    C)110 kmph
    D)160 kmph
    Answer: 140 kmph
  • Q. Who invented the railway engine?
    A)James Watt
    B)Charles Babbage
    C)Isaac Newton
    D)George Stephenson
    Answer: George Stephenson
  • Q. If position light shunt signal is placed below a stop signal, it shows ________ light in on condition.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. Depot in-charge is responsible to test the detonators once in ________.
    A)Year
    B)Monthly
    C)Weekly
    D)None of these
    Answer: Year
  • Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
    A)TD-912
    B)TA-912
    C)TB-912
    D)TC-1425
    Answer: TA-912
  • Q. “C” class ODC is run with the permission of ________.
    A)Head Quarter
    B)DOM
    C)CRS
    D)None of these
    Answer: CRS
  • Q. Train is to be started from non signalled line
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T-511
  • Q. The speed of Motor Trolly over points and crossings is
    A)15 kmph
    B)10 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?
    A)Uttar Pradesh
    B)Odisha
    C)West Bengal
    D)Chhattisgarh
    Answer: Uttar Pradesh
  • Q. When a token is lost, the lost token notice is issued and it is valid for ________ months.
    A)3
    B)6
    C)4
    D)2
    Answer: 6
  • Q. Motor Trolly can follow another motor trolly during
    A)Day and Night clear weather
    B)Day and Night
    C)Day only
    D)None of these
    Answer: Day and Night clear weather
  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3