Q. ________ must be issued during thick or foggy weather.

Correct Answer

Caution Order

More Questions on Indian Railway

  • Q. The numbers of A, B and C coaches are 72, ________ and 76.
    A)71
    B)72
    C)70
    D)75
    Answer: 70
  • Q. In automatic block system SL, the signal that can be dispensed with is
    A)Automatic Stop signal
    B)Home
    C)Starter
    D)None of these
    Answer: Automatic Stop signal
  • Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
    A)Rajinder Sachar Committee
    B)Bibek Deberoy committee
    C)Rangarajan committee
    D)Mihir Shah Committee
    Answer: Bibek Deberoy committee
  • Q. Speed of train when whistle becomes defective is ________ km/h.
    A)45/8
    B)30/8
    C)25/8
    D)40/8
    Answer: 25/8
  • Q. When baking a train from one line to the other line, it is necessary to present the train guard.
    A)Break van
    B)Point
    C)Station
    D)Any Place
    Answer: Break van
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. Competency certificate of the gateman of interlocked engineering gate is signed by
    A)Both
    B)SSE/P.way
    C)SSE/Sig.
    D)None of these
    Answer: Both
  • Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
    A)Automatic stop signal+180 Meters
    B)Next automatic stop signal
    C)Automatic stop signal+120 Meters
    D)None of these
    Answer: Next automatic stop signal
  • Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
    A)600
    B)500
    C)400
    D)800
    Answer: 600
  • Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
    A)145
    B)45
    C)90
    D)150
    Answer: 45
  • Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
    A)2 gangman
    B)JE(Pway)
    C)One gangman
    D)None of these
    Answer: JE(Pway)
  • Q. For how many days the 4500 kms BPC is valid?
    A)45 days
    B)12+3 days
    C)30 days
    D)No limit
    Answer: 12+3 days
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. Maximum height above rail level for a low passenger platform in BG is
    A)840 mm
    B)455 mm
    C)760 mm
    D)None of these
    Answer: 455 mm
  • Q. When a signal is out of use two cross bars will be put across with ________ long and 10 CM wide.
    A)03 meter
    B)01 meter
    C)02 meter
    D)04 meter
    Answer: 01 meter
  • Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
    A)540
    B)900
    C)580
    D)570
    Answer: 580
  • Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
    A)DOM
    B)AOM(G)
    C)AOM(Chg)
    D)None of these
    Answer: AOM(G)
  • Q. Ruling gradient of the division is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. In push button token less territory, before starting the train with for T/369(1) during signal failure at station in advance, SM to get ________ from that station.
    A)Both
    B)PN
    C)Non-PN
    D)None of these
    Answer: PN

Leave a Comment