- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. Joint sighting committee shall inspect the visibility of signals once in
A)6 months
B)A month
C)3 months
D)None of these
Answer: 3 months
- Q. EMU train has ________ and automatic types of working brakes.
A)Hand Brake
B)EP Brakes
C)Power Brake
D)None of these
Answer: EP Brakes
- Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
A)Army Head Quarter
B)Railway Board
C)Zonal HQ
D)None of these
Answer: Army Head Quarter
- Q. In case of ACP Guard shall proceed towards the front from ________ side.
A)Back
B)Left
C)Right
D)Noe of these
Answer: Left
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. How many Class of Accident?
A)20
B)14
C)16
D)None of these
Answer: 16
- Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
A)35
B)20
C)25
D)30
Answer: 30
- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Q. If the advanced starter and IBS are defective, SM shall issue T/369(3b) authority with private number of ________ station to pass both advanced starter and IBS.
A)Both
B)Back
C)Next
D)None of these
Answer: Next
- Q. P marker is provided for a
A)Semaphore warner
B)Colour light distance
C)Semaphore distant
D)None of these
Answer: Colour light distance
- Q. Which railway zone has become the first Rail Zone in India with 100% LED Lighting at railway stations?
A)South Western Railway
B)North Eastern Railway
C)South Central Railway
D)North Central Railway
Answer: South Central Railway
- Q. Train crew shall exchange alright hand signals upto ________ or last points.
A)Call-on
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. What is the maximum speed of a goods train pushed backed from block section ?
A)15/8 kmph
B)15 kmph
C)8 kmph
D)None of these
Answer: 8 kmph
- Q. How many copies of caution order shall be prepared for a train provided with banking engine?
A)5
B)3
C)4
D)None of these
Answer: 5
- Q. Loss of railway property of Rs. more than 2 Crores is treaed as ________ accident.
A)Both
B)Minor
C)Serious
D)None of these
Answer: Serious
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. In which institution the training of electric work is being given?
A)Railway Staff College
B)Indian Railways Institute of Mechanical and Electrical Engineering
C)Indian Railways Institute of Electrical Engineering
D)Indian Railways Institute of Civil Engineering
Answer: Indian Railways Institute of Electrical Engineering
- Q. In the work of short duration the first flag man to the approaching train must started at not less than ________ Metres from the last detonator.
A)145
B)45
C)90
D)150
Answer: 45
- Q. S mark on the EMU coach means ________.
A)Scroll
B)Release
C)Spare
D)None of these
Answer: Spare