Q. ________ must be issued during thick or foggy weather.

Correct Answer

Caution Order

More Questions on Indian Railway

  • Q. Which of the following has become the India’s first railway station to have sanitary napkin vending machine?
    A)Kolkata railway station
    B)Thane railway station
    C)Hazrat Nizamuddin railway station
    D)Bhopal railway station
    Answer: Bhopal railway station
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. Point indicator shows ________ light when the points are set for loop line.
    A)S&T (T/350)
    B)S&T (T/351)
    C)S&T (T/352)
    D)S&T (T/315)
    Answer: S&T (T/351)
  • Q. At station which signal will be taken off for block line?
    A)Shut
    B)Repeating
    C)Calling on
    D)No Signal
    Answer: No Signal
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. Number of the caution order is ________
    A)T/410
    B)T/409
    C)T/408
    D)None of these
    Answer: T/409
  • Q. For a passenger carrying train to stop with a few passengers vehicles beyond platform, it must be permitted by
    A)DOM
    B)DSO
    C)DRM
    D)None of these
    Answer: DRM
  • Q. Maximum speed of trains during day in case of OHE failure is ________
    A)65 km
    B)108 km
    C)70 km
    D)60 km
    Answer: 60 km
  • Q. TSL is started between those two stations at which cross over facility are available and
    A)D Class/IBC
    B)A Class/IBS
    C)C Class/IBS
    D)None of these
    Answer: C Class/IBS
  • Q. During TFC in single line section what authority to proceed will be served to driver of Dn train during return.
    A)TH-602
    B)T/A-602
    C)TG-602
    D)TB-602
    Answer: TH-602
  • Q. Under approved special instructions, Distant signal can be placed along with the
    A)Both
    B)Last Stop
    C)First Stop
    D)None of these
    Answer: Last Stop
  • Q. Block instrument and Advanced starter being failed after line clear?
    A)T-369(3B) with P. NO. of line clear
    B)T/C 1425
    C)T/D 602 + T-511
    D)T/D 1425
    Answer: T-369(3B) with P. NO. of line clear
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. Information of caution notice stations is given in ________.
    A)Both A or B
    B)WTT
    C)Working time table
    D)None of these
    Answer: Both A or B
  • Q. When was the construction work for the first Railway line Started?
    A)1823
    B)1821
    C)1828
    D)1830
    Answer: 1821
  • Q. The speed of a Trolley is
    A)15 kmph
    B)20 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. How many stations to be redeveloped through PPP?
    A)350
    B)100
    C)200
    D)600
    Answer: 600
  • Q. Block back are used at?
    A)Single/Double line both
    B)On Single line
    C)On Double line
    D)None of these
    Answer: Single/Double line both
  • Q. Which of the following is the largest railway junction in India?
    A)Mathura
    B)Delhi
    C)Bhatinda
    D)Allahabad
    Answer: E
  • Q. To start the train from a line with common starter, ________ authority is issued.
    A)T/512
    B)T/516
    C)T/517
    D)T/511
    Answer: T/512