- Q. Standard time is set at all station every day ________ Hours
A)16
B)10
C)15
D)None of these
Answer: 16
- Q. What will be the maximum speed if leading cab of electric engine is defective and assistant driver is operating the train from rear cab?
A)40 kmph
B)15 kmph
C)30 kmph
D)Normal
Answer: 40 kmph
- Q. During failure of signals and communications in DL automatic area the authority to proceed is
A)T/B 912
B)T/D 912
C)T/A 912
D)None of these
Answer: T/B 912
- Q. During power failure in automatic block section, on which authority relief engine will proceed?
A)TC-912
B)TA-912
C)TB-912
D)TD-912
Answer: TC-912
- Q. When unsafe condition of river bund is reported. CO to be issued for speed for day is
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
A)1972
B)1974
C)1961
D)1973
Answer: 1972
- Q. Which of the following zonal headquarters – city combination is incorrect?
A)East Central - Hajipur
B)South East Central - Bilaspur
C)North Western - Jodhpur
D)West Central - Jabalpur
Answer: North Western - Jodhpur
- Q. Colour of the semaphore calling on signal is ________.
A)Green
B)Red
C)White
D)None of these
Answer: White
- Q. What will be the speed of second train running on T/C 602?
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: Normal speed
- Q. The banner flag is a ________
A)Both of these
B)Temporary stop signal
C)Permanent stop signal
D)None of these
Answer: Temporary stop signal
- Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
A)Both
B)GDR
C)TDR
D)None of these
Answer: GDR
- Q. The Driver of goods train must stop his train as close as possible to ________.
A)Both
B)Starter
C)Advance Starter
D)None of these
Answer: Starter
- Q. A station where the rail lines end, is called
A)Block station
B)Junction station
C)Way - side station
D)Terminal station
Answer: Terminal station
- Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
A)35
B)20
C)25
D)30
Answer: 30
- Q. Speed of a passenger train passing through loop line on a station equipped with STD III interlocking?
A)75 kmph
B)140 kmph
C)160 kmph
D)15 kmph
Answer: 15 kmph
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
A)Habibganj railway station
B)Farukhnagar railway station
C)Safdarjung railway station
D)Mumbai Central railway station
Answer: Safdarjung railway station
- Q. The headquarter of Central Railway situated at?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
A)Automatic stop signal+180 Meters
B)Next automatic stop signal
C)Automatic stop signal+120 Meters
D)None of these
Answer: Next automatic stop signal
- Q. On which speed BG engine shall be run while speedometer is defective during run?
A)25 kmph
B)50 kmph
C)40 kmph
D)Maximum 10% less of MPS
Answer: Maximum 10% less of MPS