More Questions on Indian Railway
- Q. A jumper is remote control and is used for ________.
A)Control on Light, Fan etc.
B)Light
C)Fans
D)None of these
Answer: Control on Light, Fan etc.
- Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
A)One long
B)Three long
C)Short one long
D)None of these
Answer: Three long
- Q. Danger zone in 25 KV AC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 2
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. Not more than ________ persons including trollyman shall go on a trolly.
A)9
B)10
C)3
D)4
Answer: 10
- Q. Goods warning board will be provided from FSS in BG at
A)560 meters
B)1400 meters
C)1000 meters
D)None of these
Answer: 1400 meters
- Q. Departmental enquiry must be ordered by ________.
A)DRM
B)Sr. DPO
C)COM
D)Sr. DOM
Answer: DRM
- Q. Indian Railways is constructing the country’s longest railway tunnel and tallest bridge in which of the following states?
A)Assam and Maharashtra
B)Manipur and Jammu & Kashmir
C)Jammu & Kashmir & Assam
D)Maharashtra and Jammu & Kashmir
Answer: Manipur and Jammu & Kashmir
- Q. During single line working of DL the speed of the first train is ________ kmph
A)15
B)25
C)20
D)None of these
Answer: 25
- Q. If the driver does not received all right signal from the guard, he must call for is by giving.
A)On long
B)Two sharp whistles
C)One long one short.
D)None of these
Answer: Two sharp whistles
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
A)Rajinder Sachar Committee
B)Bibek Deberoy committee
C)Rangarajan committee
D)Mihir Shah Committee
Answer: Bibek Deberoy committee
- Q. On which speed BG train should be run while speedometer failed in block section?
A)No need to reduced speed
B)10% less of sectional speed
C)10% less of booked speed
D)40 kmph
Answer: 10% less of sectional speed
- Q. To receive a train on unsignalled line, ________ authority is issued.
A)T/369(4b) Pilot in MEMU
B)T/369(3b) Pilot in MEMO
C)T/369(2B) Pilot in MEMO
D)T/369(5b) Pilot in MEMU
Answer: T/369(3b) Pilot in MEMO
- Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.
A)43
B)41
C)42
D)45
Answer: 45
- Q. Who will be called Sahayak?
A)Coolies
B)New Superfast Train
C)Upcoming Event made for Disabled Persons
D)Railway Magazine (including Railway's upcoming ventures)
Answer: Coolies
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. Which of the following ran the first train from Bori Bunder to Thane in 1853?
A)Central India Railway
B)Bombay Baroda Railway
C)The Scindia Railway
D)Great Indian Peninsula Railway
Answer: Great Indian Peninsula Railway
- Q. Motor Trolly can follow another motor trolly during
A)Day and Night clear weather
B)Day and Night
C)Day only
D)None of these
Answer: Day and Night clear weather