More Questions on Indian Railway
- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. When a train is working on T/B 912 in automatic block in system the speed of train when the view ahead is clear with straight line is
A)15 kmph
B)25 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. The turning out time off BD SPL. During day is ________ minutes
A)50
B)30
C)20
D)None of these
Answer: 30
- Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
A)LI
B)TI
C)CI
D)None of these
Answer: TI
- Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. While receiving train on an obstructed line and danger signal must be shown to LP at
A)40 meters from obstruction
B)45 meters
C)30 meters
D)None of these
Answer: 45 meters
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. For work of long duration, the stop indicator must be erected at not less than
A)40
B)30
C)50
D)45
Answer: 30
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. The Mughalsarai junction has recently renamed as Deen Dayal Upadhyaya railway station. It is located in which state?
A)Uttarakhand
B)Bihar
C)Uttar Pradesh
D)Delhi
Answer: Uttar Pradesh
- Q. After how much time Any goods train shall be treated as overdue train?
A)After 20 minutes
B)After 10 minutes
C)After 15 minutes
D)After 25 minutes
Answer: After 20 minutes
- Q. “Act” means the Railway Act is ________.
A)1989 (22 of 1989)
B)1989 (24 of 1989)
C)1989 (23 of 1989)
D)None of these
Answer: 1989 (24 of 1989)
- Q. Maximum of ________ cranes can be attached in a passenger train.
A)3
B)1
C)2
D)4
Answer: 1
- Q. The speed of a Trolley is
A)15 kmph
B)20 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. During shunting, outer, home and ________ signals are not taken off.
A)Both
B)Last stop signal
C)First stop signal
D)None of these
Answer: First stop signal
- Q. Sounding of ________ hooters means accident of goods train at home station.
A)6
B)2
C)4
D)8
Answer: 2
- Q. Trolley caution order no is ________.
A)600
B)400
C)500
D)800
Answer: 400
- Q. Indian Railways has launched an integrated mobile app “Rail Saarthi” for railway passengers. What does “Saarthi” stands for?
A)Synchronous Advanced Application Rail Travel Help and Information
B)Synergised Advanced Application Rail Travel Help and Information
C)Synchronic Advanced Application Rail Travel Help and Information
D)Synergic Advanced Application Rail Travel Help and Information
Answer: Synergised Advanced Application Rail Travel Help and Information
- Q. ________ tail board will be used is EMU train.
A)Turn Over & Turn Flow
B)Turnover
C)Turn Flow
D)None of these
Answer: Turnover