Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is

Correct Answer

2

More Questions on Indian Railway

  • Q. Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
    A)Not more than two bogies or their equivalent
    B)Two Bogies
    C)04 four wheelers only
    D)None of these
    Answer: Not more than two bogies or their equivalent
  • Q. At the starting station, passenger train must have ________ % of brake power.
    A)90
    B)75
    C)50
    D)100
    Answer: 100
  • Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 15 kmph
  • Q. India’s first rail auto hub will be located in:
    A)Delhi
    B)Kolkata
    C)Chennai
    D)New Delhi
    Answer: Chennai
  • Q. Trap indicator is provided to indicate ________.
    A)Provision Switch
    B)Indication Switch
    C)Derailing switch
    D)None of these
    Answer: Derailing switch
  • Q. Which railway station entered Limca Book of Records 2018 for having all – women staff?
    A)Hazrat Nizamuddin railway station
    B)Chhatrapati Shivaji Terminus railway station
    C)Matunga railway station
    D)Kolkata railway station
    Answer: Matunga railway station
  • Q. On which authority relief train shall be dispatched for obstructed block section?
    A)On memo
    B)PLCT
    C)T/A602
    D)None of these
    Answer: T/A602
  • Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
    A)600 meters
    B)400 meters
    C)500 meters
    D)800 meters
    Answer: 600 meters
  • Q. A station where the rail lines end, is called
    A)Block station
    B)Junction station
    C)Way - side station
    D)Terminal station
    Answer: Terminal station
  • Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
    A)0000-000
    B)000000-0000 0
    C)00000-0
    D)0000-0000
    Answer: 000000-0000 0
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Red
  • Q. Signal failure advised to the driver through the station in rear will be inform
    A)T/369(3b)
    B)T/369
    C)T/370
    D)None of these
    Answer: T/369
  • Q. Sounding of 4 hooters means ________.
    A)ART & MRV requirement at home Station
    B)ART
    C)MRV
    D)None of these
    Answer: ART & MRV requirement at home Station
  • Q. Consider the following statements about the proposed Rail Development Authority: 1)It will act within the parameters of the Railway Act, 1989 2)The authority will consist of four members 3)It will regulate the sector opened to the private sector for investment Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 2 Only
    C)3 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
    A)Only 2 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 3
    Answer: Only 3
  • Q. In one train only system, information of lost of metal token is given to ________.
    A)DRM
    B)DOM
    C)AOM
    D)None of these
    Answer: DRM
  • Q. Reminder Caution Order is?
    A)T/B409
    B)T/409
    C)T/A409
    D)None of these
    Answer: T/B409
  • Q. The form number of authority to proceed without line clear is ________.
    A)T/B1408
    B)T/1408
    C)T/A1408
    D)None of these
    Answer: T/1408
  • Q. The world’s highest railway bridge will come up over which Indian River?
    A)Ganga
    B)Narmada
    C)Godavari
    D)Chenab
    Answer: Chenab