More Questions on Indian Railway
- Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
A)100 meter
B)200 meter
C)250 meter
D)400 meters and more
Answer: 400 meters and more
- Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
A)Only 2 & 3
B)Only 1
C)Only 1 & 2
D)Only 3
Answer: Only 3
- Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km
B)4300 Km
C)3700 Km
D)5298 km
Answer: 3700 Km
- Q. How many Class of Accident?
A)20
B)14
C)16
D)None of these
Answer: 16
- Q. If any Loco pilot leave from his duty place without to informed to his supervisor, it is treated as?
A)A & B both
B)Absent from his duty
C)Indiscipline
D)None of these
Answer: Absent from his duty
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. Visibility test object is placed at a distance of ________ meters from the station building.
A)180
B)108
C)100M
D)200
Answer: 180
- Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
A)40/15 kmph
B)60/30 kmph
C)35/20 kmph
D)Normal speed
Answer: 35/20 kmph
- Q. Illuminated A marker of semi-automatic signal means ________.
A)Outer signal
B)Working as automatic signal
C)Semi signal
D)None of these
Answer: Working as automatic signal
- Q. Railway staff collage is situated at ________.
A)Chennai
B)Vadodara
C)Kanyakumari
D)New Delhi
Answer: Vadodara
- Q. Duplicate signal is ________.
A)Co-acting signal
B)Home Signal
C)Warner Signal
D)None of these
Answer: Co-acting signal
- Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
A)20 days
B)10 days
C)15 days
D)None of these
Answer: 15 days
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00
B)000-000
C)00-00
D)000-000-000
Answer: 000-000
- Q. Where is the extreme north of India a railway station?
A)Pathankot
B)Jammu Tawi
C)Baramulla
D)Guwahati
Answer: Baramulla
- Q. Through which of the following group of states does the Konkan Railways run?
A)Maharashtra - Karnataka - Kerala - Tamil Nadu
B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
C)Maharashtra - Karnataka - Goa
D)Karnataka - Goa - Kerala - Tamil Nadu
Answer: Maharashtra - Karnataka - Goa
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. Where did Chapman form the committee?
A)Edimbara
B)Glassgo
C)London
D)Lords
Answer: London
- Q. Length of BOXN Wagon is
A)10.71 meters
B)8.67 meters
C)9.78 meters
D)None of these
Answer: 10.71 meters
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State