Q. After passing an automatic stop signal at ON. If the Driver finds a train or obstruction he must stop his train at ________ away from the train or obstruction.

Correct Answer

150 meters

More Questions on Indian Railway

  • Q. Yearly coaching stock census is taken on ________.
    A)31st January
    B)31st December
    C)31st October
    D)31st March
    Answer: 31st October
  • Q. The speed of lorry shall not exceed
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 10 kmph
  • Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. Isolation shall be provided at an interlocked station when the speed is
    A)Above 50 kmph
    B)50 kmph
    C)75 kmph
    D)None of these
    Answer: Above 50 kmph
  • Q. In MACLS system, if approach signal becomes blank, ________ authority is issued from the station in rear.
    A)T/407
    B)T/409
    C)T/408
    D)T/406
    Answer: T/409
  • Q. Adequate distance means the distance sufficient to ensure ________.
    A)Station Limit
    B)Safety
    C)Non-Safety
    D)None of these
    Answer: Safety
  • Q. Speed of following tower wagon in the block section is ________ km/h.
    A)8
    B)5
    C)2
    D)4
    Answer: 8
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
    A)Both
    B)GDR
    C)TDR
    D)None of these
    Answer: GDR
  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. TCAS full form is:
    A)Train Collision Avoidance Software
    B)Train Collision Advance System
    C)Train Complement Accident Software
    D)Traffic Collision Avoidance System
    Answer: Traffic Collision Avoidance System
  • Q. What is the massage of 0000(Four short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control,
    D)Unable to proceed, Guard protect the train in rear
    Answer: Unable to proceed, Guard protect the train in rear
  • Q. During shunting, outer, home and ________ signals are not taken off.
    A)Both
    B)Last stop signal
    C)First stop signal
    D)None of these
    Answer: First stop signal
  • Q. Time taken by train running at booked speed is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Normal running time
  • Q. How many training institutions of Railways are in India?
    A)Five
    B)Three
    C)Four
    D)Six
    Answer: Five
  • Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
    A)Shaktimaan
    B)Surakhsha
    C)Rail Rakshak
    D)Rakshak
    Answer: Rakshak
  • Q. Maximum height above rail level for a low passenger platform in BG is
    A)840 mm
    B)455 mm
    C)760 mm
    D)None of these
    Answer: 455 mm
  • Q. On double line, when a running line is blocked by stabled load , the point to be set against are
    A)Advance point
    B)Either side points
    C)Rear points
    D)None of these
    Answer: Rear points
  • Q. Goods warning board will be provided from FSS in BG at
    A)560 meters
    B)1400 meters
    C)1000 meters
    D)None of these
    Answer: 1400 meters
  • Q. When was the Jammu City appeared on the map of Indian Railway?
    A)1967
    B)1956
    C)1963
    D)1965
    Answer: 1965

Leave a Comment