Q. To apply for Line block, the notice shall be given to DRM not less than

Correct Answer

24 hours

More Questions on Indian Railway

  • Q. On which time the departure signal shall be taken off for run through train passing via loop line?
    A)After entering in loop line
    B)Before entering at station
    C)After stopped at station
    D)Before 10 minutes from expected arrival
    Answer: Before 10 minutes from expected arrival
  • Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
    A)3
    B)1
    C)2
    D)4
    Answer: 3
  • Q. The minimum distance from centre to centre of track in BG is
    A)13 feet
    B)14 feet
    C)12 feet
    D)None of these
    Answer: 14 feet
  • Q. Slip siding protects
    A)Station section
    B)Station limit
    C)Block section
    D)None of these
    Answer: Block section
  • Q. Record of caution order is kept for ________ months.
    A)9
    B)10
    C)5
    D)12
    Answer: 12
  • Q. Hand shunting is performed at speed not exceeding
    A)05 kmph
    B)10 kmph
    C)08 kmph
    D)None of these
    Answer: 05 kmph
  • Q. SCOR maintains ________ register when serious accident occurs.
    A)Chronological
    B)Logical
    C)Un-logical
    D)None of these
    Answer: Chronological
  • Q. Ruling gradient of the division is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Where there is no TSR, station master shall make entries in ________.
    A)Mid section
    B)Station diary
    C)Diary
    D)None of these
    Answer: Station diary
  • Q. Where is the extreme north of India a railway station?
    A)Pathankot
    B)Jammu Tawi
    C)Baramulla
    D)Guwahati
    Answer: Baramulla
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. How many institutions do give suggestions for railways technology?
    A)Three
    B)One
    C)Two
    D)Four
    Answer: Two
  • Q. When baking a train from one line to the other line, it is necessary to present the train guard.
    A)Break van
    B)Point
    C)Station
    D)Any Place
    Answer: Break van
  • Q. When the signal is blank in MACLS system, it is treated as showing ________ aspect.
    A)Defective
    B)Restricted
    C)Most restricted
    D)Noe of these
    Answer: Most restricted
  • Q. Signal sighting committee consists of TI, SI/PWI and ________.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. To receive a train on unsignalled line, ________ authority is issued.
    A)T/369(4b) Pilot in MEMU
    B)T/369(3b) Pilot in MEMO
    C)T/369(2B) Pilot in MEMO
    D)T/369(5b) Pilot in MEMU
    Answer: T/369(3b) Pilot in MEMO
  • Q. When unsafe condition of river bund is reported. CO to be issued for speed for day is
    A)20 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Hand shunting of vehicles in gradients ________ is totally prohibited
    A)1 In 100 or steeper
    B)1 in 400 or Steeper
    C)1 in 200 or steeper
    D)None of these
    Answer: 1 in 400 or Steeper
  • Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
    A)12 hours
    B)04 hours
    C)08 hours
    D)16 hours
    Answer: 16 hours
  • Q. Used for A self propelled vehicle repairs in OHE is
    A)Moped Trolley
    B)Tower wagon
    C)Ladder Trolley
    D)None of these
    Answer: Tower wagon

Leave a Comment