More Questions on Indian Railway
- Q. By whom the rear portion of train left behind in block section protected?
A)By engineearing official
B)By Guard
C)By LP
D)No need to protect the load
Answer: By Guard
- Q. While receiving train on an obstructed line and danger signal must be shown to LP at
A)40 meters from obstruction
B)45 meters
C)30 meters
D)None of these
Answer: 45 meters
- Q. Read the Following Railway Headquarters and Identify which is False?
A)South Railway - Chennai
B)South - Central Railway - Secunderabad
C)Central railway - Bhopal
D)North Railway - New Delhi
Answer: Central railway - Bhopal
- Q. When four wheeler attached, speed of passenger train will be ________ km/h.
A)85
B)80
C)75
D)90
Answer: 75
- Q. Load table is mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Consider the following statements with regard to ‘Ad Hoc’ Committees of the parliament: 1)They are temporary in nature and appointed for a specific purpose 2)Railway Convention Committee is an ad hoc committee Which among the above statements is / are correct?
A)Both 1 & 2 are correct
B)Only 1 is correct
C)Only 2 is correct
D)Neither 1 nor 2 is correct
Answer: Both 1 & 2 are correct
- Q. How many stations to be redeveloped through PPP?
A)350
B)100
C)200
D)600
Answer: 600
- Q. Nil Caution order number is ________
A)T/C409
B)T/A-409
C)T/B-409
D)None of these
Answer: T/A-409
- Q. Stop signal is to be passed in On position.
A)T-806
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(3b)
- Q. During serious accident, ________ will be the in-charge of control office.
A)Sr. DOM
B)DOM
C)AOM
D)None of these
Answer: Sr. DOM
- Q. Who will be called Sahayak?
A)Coolies
B)New Superfast Train
C)Upcoming Event made for Disabled Persons
D)Railway Magazine (including Railway's upcoming ventures)
Answer: Coolies
- Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
A)20
B)25
C)15
D)None of these
Answer: 25
- Q. In automatic area, when all signals and communications have failed, the driver is issued ________ as authority to proceed.
A)T/A-912
B)T/B-912
C)T/C-912
D)None of these
Answer: T/B-912
- Q. Block overlap in multiple aspect signalling system is ________ meters.
A)180
B)200
C)300
D)208
Answer: 180
- Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
A)15 kmph
B)8 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. BSLB determines the limits of block section and ________ .
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. On seeing defective stop signal during train working, Loco Pilot will sound ________ whistle to inform the same.
A)One long one short
B)One Long Two Short
C)Two long one short
D)None of these
Answer: One Long Two Short
- Q. Which of the following is the easternmost division of the Indian Railways?
A)Rangiya
B)Tinsukia
C)Lumding
D)Katihar
Answer: Tinsukia
- Q. Validity of the competency certificate of the gateman is for ________ years.
A)9
B)10
C)3
D)4
Answer: 3
- Q. Which of the following is the largest zone in terms of route kilometers?
A)Northern Railways
B)Western Railways
C)Eastern Railways
D)Southern Railways
Answer: Northern Railways
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State