- Q. What is the means of EA in WTT?
A)Extra recovery time
B)Extra allowances
C)Engineering allowances
D)None of these
Answer: Engineering allowances
- Q. Load infringing standard moving dimensions (ISMD) shall be moved by
A)Work trains
B)Through train
C)Shunting trains
D)None of these
Answer: Through train
- Q. Which hooters shall be blown in case of accident on a goods train at outside from ART HQ station?
A)Two
B)Four
C)Three
D)Any one
Answer: Three
- Q. Modified lower quadrant signaling may be introduced only with section of
A)GM
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. When the driver reports rough running or lurch on the run, the SM to issue caution order with speed ________ kmph
A)20
B)10
C)15
D)None of these
Answer: 10
- Q. Railway Staff College is situated at
A)Chennai
B)Bangalore
C)Secunderabad
D)Vadodara
Answer: Vadodara
- Q. The speed of lorry shall not exceed
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. Metro Railway is functioning in which of the following Indian States?
A)West Bengal
B)Gujarat
C)Maharashtra
D)Tamil Nadu
Answer: West Bengal
- Q. Any person aggrieved by a decision if labour commissioner may prefer an appeal to the central government within ________ days from the Regional Labour Commissioner
A)30
B)10
C)20
D)None of these
Answer: 30
- Q. How many minimum BP pressure is require in engine to charge Goods train?
A)5.8 kg/cm2 D. 5.00 kg/cm2
B)4.8 kg/cm2 B. 6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
C)6.00 kg/cm2 C. 5.8 kg/cm2 D. 5.00 kg/cm2
D)5.00 kg/cm2
Answer: 5.00 kg/cm2
- Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
A)540
B)900
C)580
D)570
Answer: 580
- Q. How many surrounding area may be sealed from fire in case of leakage in LPG tank wagon?
A)1500 meters
B)200 meters
C)1000 meters
D)2000 meters
Answer: 1000 meters
- Q. The speed of a Trolley is
A)15 kmph
B)20 kmph
C)8 kmph
D)None of these
Answer: 15 kmph
- Q. First Train started in India?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. TCAS full form is:
A)Train Collision Avoidance Software
B)Train Collision Advance System
C)Train Complement Accident Software
D)Traffic Collision Avoidance System
Answer: Traffic Collision Avoidance System
- Q. Capacity of a catch siding is ________.
A)Station
B)Equivalent to length of full train
C)Length
D)None of these
Answer: Equivalent to length of full train
- Q. passing through station during day when running without brakevan and tail board.
A)25 kmph
B)10 kmph
C)20 kmph
D)Normal speed
Answer: 20 kmph
- Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC
B)A Class/IBS
C)C Class/IBS
D)None of these
Answer: C Class/IBS
- Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?
A)Sutlej
B)Chenab
C)Jhelum
D)Indus
Answer: Chenab