Q. SLB determines the limits of Station section and ________

Correct Answer

Block Section

More Questions on Indian Railway

  • Q. D class station board is placed ________ meters from the end of the platform.
    A)600
    B)400
    C)500
    D)800
    Answer: 500
  • Q. If the G marker Gate signal is at ON, Loco pilot may pass it after stopping for 01 minute by day and ________ minutes by night.
    A)8
    B)5
    C)2
    D)4
    Answer: 2
  • Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
    A)Shunt signal
    B)Calling-on Signal
    C)Home Signal
    D)None of these
    Answer: Home Signal
  • Q. To start a train from unsignalled line ________ authority is issued.
    A)T/511
    B)T/512
    C)T/515
    D)T/521
    Answer: T/511
  • Q. In case of 1 in 100 rising gradient, ________ siding is provided.
    A)Slip
    B)Long
    C)Catch
    D)None of these
    Answer: Slip
  • Q. On which place the competent Railway servant shall be appointed to show proceed hand signal while receive a train on obstructed line on calling-on signal?
    A)45 meters beyond the obstruction
    B)At 1st facing point of station
    C)Facing point of concern line
    D)No need
    Answer: 45 meters beyond the obstruction
  • Q. At Terminal yards where the signal overlap is zero, the speed over facing points is ________ kmph
    A)10
    B)20
    C)30
    D)None of these
    Answer: 10
  • Q. On which speed BG train should be run while speedometer failed in block section?
    A)No need to reduced speed
    B)10% less of sectional speed
    C)10% less of booked speed
    D)40 kmph
    Answer: 10% less of sectional speed
  • Q. The speed of shunting is ________.
    A)10 kmph
    B)15 kmph
    C)20 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Information of caution notice stations is given in ________.
    A)Both A or B
    B)WTT
    C)Working time table
    D)None of these
    Answer: Both A or B
  • Q. If position light shunt signal is placed below a stop signal, it shows ________ light in on condition.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. What is the means of EA in WTT?
    A)Extra recovery time
    B)Extra allowances
    C)Engineering allowances
    D)None of these
    Answer: Engineering allowances
  • Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below:
    A)1, 2, 3, 4 & 5
    B)Only 2, 3 & 4
    C)Only 2, 3, 4, 5
    D)Only 2, 3 & 5
    Answer: 1, 2, 3, 4 & 5
  • Q. Station limit is the portion between ________.
    A)Both
    B)Outermost signal
    C)Innermost signal
    D)None of these
    Answer: Outermost signal
  • Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. EMU train has ________ and automatic types of working brakes.
    A)Hand Brake
    B)EP Brakes
    C)Power Brake
    D)None of these
    Answer: EP Brakes
  • Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
    A)100 meter
    B)200 meter
    C)250 meter
    D)400 meters and more
    Answer: 400 meters and more
  • Q. The largest national enterprise of India is
    A)Airways
    B)Indian Railway
    C)Indian Shipyard
    D)Waterways
    Answer: Indian Railway
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters