- Q. SLB determines the limits of Station section and ________
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Block Section
- Q. Palace on Wheels train was inaugurated in which year?
A)1982
B)1988
C)1972
D)1965
Answer: 1982
- Q. On which of the following is the longest railway bridge in India located?
A)River Brahmaputra
B)River Ganges
C)Vembanad Lake
D)Chilka Lake
Answer: River Brahmaputra
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40
B)20
C)30
D)None of these
Answer: 30
- Q. When unsafe condition of river bund is reported. CO to be issued for speed for day is
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
A)8
B)10
C)6
D)None of these
Answer: 6
- Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.
A)35
B)20
C)25
D)30
Answer: 30
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 4.8 kg/cm2 of BP pressure in the brake van.
A)5
B)4
C)2
D)8
Answer: 5
- Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
A)2 gangman
B)JE(Pway)
C)One gangman
D)None of these
Answer: JE(Pway)
- Q. What will be the maximum speed of B-Class ODC in Broad guage?
A)40 kmph
B)15 kmph
C)25 kmph
D)75 kmph
Answer: 40 kmph
- Q. Shunting speed of 5 box wagons is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 2
- Q. Semi-automatic signal is identified by ________.
A)Illuminated a marker
B)Marker
C)Semi marker
D)None of these
Answer: Illuminated a marker
- Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
A)25 kmph
B)30 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
A)T/A 602
B)T-806
C)T/A 802
D)T-806 A
Answer: T-806
- Q. The first Shatabdi express was introduced between which of the following locations?
A)New Delhi and Jhansi
B)Bombay and Thane
C)Bombay and Kolkata
D)New Delhi and Chennai
Answer: New Delhi and Jhansi
- Q. At which of the following places Diesel Component Works is established?
A)Perambur
B)Jamshedpur
C)Patiala
D)Varanasi
Answer: Patiala
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. At the starting station, CC rake goods train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. Calling on signal shows ________ light in off position in two aspect signalling system.
A)Green
B)White
C)RED
D)Yellow
Answer: Yellow