Q. Time taken by train running at booked speed is called as ________.

Correct Answer

Normal running time

More Questions on Indian Railway

  • Q. Hand shunting of vehicles is prohibited in gradient
    A)1 - 400 or steeper
    B)1 - 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400 or steeper
  • Q. The Indian Railways has launched which virtual server to optimise server usage and faster connectivity?
    A)RailSilver
    B)RailSagar
    C)RailCloud
    D)RailBharat
    Answer: RailCloud
  • Q. Speed of following tower wagon in the block section is ________ km/h.
    A)8
    B)5
    C)2
    D)4
    Answer: 8
  • Q. Not more than ________ officials can travel in the locomotive unless authorised by operating official.
    A)3
    B)2
    C)4
    D)6
    Answer: 3
  • Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
    A)Hand
    B)Outer
    C)Call-On
    D)Non eof these
    Answer: Outer
  • Q. Distance between outer and home signals on a double line is ________ meters.
    A)400
    B)900
    C)800
    D)700
    Answer: 400
  • Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
    A)25
    B)75
    C)15
    D)30
    Answer: 15
  • Q. If a member disagrees with the reasons of the joint note of an accident, he may give
    A)Both
    B)Accident
    C)Dissent
    D)None of these
    Answer: Dissent
  • Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
    A)1000 meters
    B)400 meters
    C)600 meters
    D)None of these
    Answer: 600 meters
  • Q. When the platform level is ________ MM and more second arriving train shall not be received and berthed on non platform line directly.
    A)650
    B)700
    C)725
    D)760
    Answer: 760
  • Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
    A)Walkie-Talkie
    B)Walkie
    C)VHF
    D)None of these
    Answer: Walkie-Talkie
  • Q. Maximum No. of ________ track machines can be sent for working in a block section.
    A)25
    B)20
    C)15
    D)30
    Answer: 25
  • Q. Where is the Research, Design and Standard Organisation situated?
    A)Pune
    B)Lucknow
    C)Bangalore
    D)New Delhi
    Answer: Lucknow
  • Q. Semaphore of the signal is painted in the colour as it shows in the night in ________ condition.
    A)Both
    B)Off
    C)On
    D)None of these
    Answer: On
  • Q. Who has been appointed as the new Union Minister of Railways?
    A)Ashwini Vaishnaw
    B)Piyush Goyal
    C)Nirmala Sitharaman
    D)Mukhtar Abbas Naqvi
    Answer: Ashwini Vaishnaw
  • Q. Who has been appointed as the new Chairman of Railway Board?
    A)P S Thakur
    B)V K Yadav
    C)A K Mittal
    D)Neelmani Reddy
    Answer: V K Yadav
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. In automatic block area SL. The LSS shall not be taken off unless the line is clear upto
    A)Automatic stop signal+180 Meters
    B)Next automatic stop signal
    C)Automatic stop signal+120 Meters
    D)None of these
    Answer: Next automatic stop signal
  • Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters