Q. It is the responsibility of SM to see that shunting is performed as per ________.

Correct Answer

SWR

More Questions on Indian Railway

  • Q. India’s first Antyodaya Express has been launched by the Minister of Railways. The express will run between which stations?
    A)New Delhi and Kanyakumari
    B)Ernakulam and Howrah
    C)Sriganganagar and Tiruchirapalli
    D)Nizamuddin and Palakkad
    Answer: Ernakulam and Howrah
  • Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
    A)5 kmph
    B)3 kmph
    C)4 kmph
    D)6 kmph
    Answer: 5 kmph
  • Q. If any Loco pilot leave from his duty place without to informed to his supervisor, it is treated as?
    A)A & B both
    B)Absent from his duty
    C)Indiscipline
    D)None of these
    Answer: Absent from his duty
  • Q. Guard shall exchange alright hand signal from ________ side while the train is started from the station.
    A)Both
    B)Path
    C)Platform
    D)None of these
    Answer: Platform
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
    A)10 meters
    B)20 meters
    C)15 meters
    D)5 meters
    Answer: 20 meters
  • Q. The railway station situated in the extreme south is
    A)Kanyakumari
    B)Chennai
    C)Cochin
    D)Trivandrum
    Answer: Kanyakumari
  • Q. The number of line clear ticket in up direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/B 1425
    Answer: T/C 1425
  • Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
    A)1972
    B)1974
    C)1961
    D)1973
    Answer: 1972
  • Q. Patrolman becoming overdue during night.
    A)40 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 10 kmph
  • Q. Length of a standard BG loop line is
    A)720 meters
    B)686 meters
    C)670 meters
    D)None of these
    Answer: 686 meters
  • Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
    A)Counter circuit
    B)Track circuit/axle counter
    C)Circuit
    D)None of these
    Answer: Track circuit/axle counter
  • Q. Train is to be started from non signalled line
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T-511
  • Q. Which is the longest station name in Indian Railways?
    A)Kharagpur
    B)Kanyakumari
    C)Venkatanarasimharajuvaripeta
    D)Chhatrapati Shivaji Terminus
    Answer: Venkatanarasimharajuvaripeta
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. What was the main source of earning of Railway?
    A)Catering
    B)Goods fair
    C)Passenger fair
    D)None of thses
    Answer: Goods fair
  • Q. What is the massage of 000 (three short) whistle sound by loco pilot?
    A)Train parting
    B)Signal Approaching
    C)Train out of control
    D)Unable to proceed
    Answer: Train out of control
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. The headquarter of Central Railway situated at?
    A)Gwalior
    B)Mumbai (CST)
    C)Mumbai (Church Gate)
    D)Gorakhpur
    Answer: Mumbai (CST)
  • Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
    A)6
    B)10
    C)8
    D)4
    Answer: 6

Leave a Comment