More Questions on Indian Railway
- Q. BSLB determines the limits of block section and ________ .
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. What is maximum width for 8-Wheeled Goods stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3050 mm
- Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi
B)Hyderabad
C)Chennai
D)Kolkata
Answer: Hyderabad
- Q. The headquarters of Northern Railway is at
A)Gorakhpur
B)New Delhi
C)Guwahati
D)Mumbai (CST)
Answer: New Delhi
- Q. Station Master shall give line clear with ________ while granting line clear.
A)Calling-on
B)Shunt signal
C)Private No.
D)None of these
Answer: Private No.
- Q. Elphinstone Road suburban railway station which was recently renamed as Prabhadevi is situated in?
A)Tamil Nadu
B)Mumbai
C)Bengaluru
D)New Delhi
Answer: Mumbai
- Q. What is the maximum speed of shunting of a petrol tank wagon?
A)2 kmph
B)15 kmph
C)8 kmph
D)5 kmph
Answer: 8 kmph
- Q. The number of Train examination report is ________.
A)T/436
B)T/431
C)T/432
D)T/436
Answer: T/431
- Q. Who is the current director general of Railway Protection Force (RPF)?
A)Dharmendra Kumar
B)Brij Mohanty
C)S H Prakash
D)Arun Kumar
Answer: Arun Kumar
- Q. Wagon with livestock shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Patrolman becoming overdue during night.
A)40 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 10 kmph
- Q. SLB determines the limits of block section and ________.
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. Trolley caution order no is ________.
A)600
B)400
C)500
D)800
Answer: 400
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. Which of the following zones administers the Matheran Hill Railway?
A)Central Railways
B)Konkan Railways
C)Western Railways
D)Southern Railways
Answer: Central Railways
- Q. During shunting, outer, home and ________ signals are not taken off.
A)Both
B)Last stop signal
C)First stop signal
D)None of these
Answer: First stop signal
- Q. In context with the Indian railways what is TPWS?
A)Train Protection Warning Stopper
B)Train Passenger Warning System
C)Train Protection Warning System
D)Transmission Protection warning Stopper
Answer: Train Protection Warning System
- Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
A)2 gangman
B)JE(Pway)
C)One gangman
D)None of these
Answer: JE(Pway)
- Q. ________ is measured with the help of anemometer.
A)Both
B)Wind
C)Velocity
D)None of these
Answer: Both
- Q. Length of BOXN Wagon is
A)10.71 meters
B)8.67 meters
C)9.78 meters
D)None of these
Answer: 10.71 meters