Q. Capacity of a slip siding is ________

Correct Answer

03 or 04 wagon

More Questions on Indian Railway

  • Q. In case of movement from one station to another station upto how many track machine with one camping coach each shall be allowed under one authority to proceed?
    A)8
    B)3
    C)5
    D)10
    Answer: 3
  • Q. Seikan Tunnel which is a Railway tunnel with less than half length under seabed is located in which country?
    A)North Korea
    B)Japan
    C)South Korea
    D)China
    Answer: Japan
  • Q. At what time the first train in Indian (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
    A)20
    B)10
    C)15
    D)None of these
    Answer: 15
  • Q. Station Working Rules of Non-interlocked station is signed by ________.
    A)AOM & ADEN
    B)DOM & DEN
    C)Sr. DOM & Sr. DEN
    D)None of these
    Answer: Sr. DOM & Sr. DEN
  • Q. SLB determines the limits of Station section and ________
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. Where was the B.B.C.I locomotive started?
    A)Boriville
    B)Jamalpur
    C)Parel
    D)Hyderabad
    Answer: Parel
  • Q. At a C’ class staion in two aspect signalling system, ________ and home signals are provided.
    A)Sectional
    B)Corner
    C)Warner
    D)None of these
    Answer: Warner
  • Q. Who has been appointed as the new Chairman of Railway Board?
    A)P S Thakur
    B)V K Yadav
    C)A K Mittal
    D)Neelmani Reddy
    Answer: V K Yadav
  • Q. The driver shall sound the following whistle to indicate that the fouling marks is not clear
    A)One long
    B)Three long
    C)Short one long
    D)None of these
    Answer: Three long
  • Q. Line clear is obtained from ________ / ________ to send the train upto IBS.
    A)Counter circuit
    B)Track circuit/axle counter
    C)Circuit
    D)None of these
    Answer: Track circuit/axle counter
  • Q. Number of the Reminder caution order is ________.
    A)T/C 410
    B)T/A 409
    C)T/B 409
    D)None of these
    Answer: T/B 409
  • Q. Signal passed at danger is treated as ________ accident.
    A)Indirection
    B)Indicative
    C)Direct
    D)None of these
    Answer: Indicative
  • Q. General rules may be modified by ________.
    A)T/C 912
    B)T/B 912
    C)T/D 912
    D)T/A 912
    Answer: T/D 912
  • Q. IBS shows ________ light in normal condition.
    A)Green
    B)White
    C)Red
    D)Yellow
    Answer: Red
  • Q. When baking a train from one line to the other line, it is necessary to present the train guard.
    A)Break van
    B)Point
    C)Station
    D)Any Place
    Answer: Break van
  • Q. Shunting speed of 5 box wagons is ________ km/h.
    A)6
    B)2
    C)5
    D)8
    Answer: 2
  • Q. In case of vehicles escaping on wrong line, ________ bell code is given on block Instrument to inform the station in advance.
    A)0000-000
    B)000000-0000
    C)00000-0
    D)0000-0000
    Answer: 000000-0000
  • Q. When was the Jammu City appeared on the map of Indian Railway?
    A)1967
    B)1956
    C)1963
    D)1965
    Answer: 1965
  • Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
    A)1972
    B)1974
    C)1961
    D)1973
    Answer: 1972