Q. Water over track is 90 mm.

Correct Answer

10 kmph

More Questions on Indian Railway

  • Q. On which speed BG train should be run while speedometer failed in block section?
    A)No need to reduced speed
    B)10% less of sectional speed
    C)10% less of booked speed
    D)40 kmph
    Answer: 10% less of sectional speed
  • Q. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
    A)20
    B)10
    C)15
    D)25
    Answer: 10
  • Q. SLB determines the limits of Station section and ________
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Block Section
  • Q. Food Safety and Standards Authority of India (FSSAI) certified ________ as India’s first Eat Right Station.
    A)Mumbai Central railway station
    B)Chennai Central railway station
    C)Chhatrapati Shivaji Maharaj railway station
    D)Bengaluru Central railway station
    Answer: Mumbai Central railway station
  • Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)4
    B)10
    C)9
    D)3
    Answer: 10
  • Q. Slip siding protects
    A)Station section
    B)Station limit
    C)Block section
    D)None of these
    Answer: Block section
  • Q. When an incomplete parted portion arrives at a station the Driver to stop his train at ________ and give one long one short one long one short whistle.
    A)Both
    B)Outer Most facing Points
    C)Inner Most facing signal
    D)None of these
    Answer: Outer Most facing Points
  • Q. For disconnection of points S&T official must issue form ________
    A)T/B 351
    B)T/351
    C)T/A 351
    D)None of these
    Answer: T/351
  • Q. What does the Slip siding protects?
    A)Block Section
    B)Station Section
    C)Station Limit
    D)Siding
    Answer: Block Section
  • Q. If the goods train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
    A)10
    B)3
    C)4
    D)20
    Answer: 20
  • Q. What will be the speed of second train running on T/C 602?
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
    A)25
    B)75
    C)15
    D)30
    Answer: 15
  • Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
    A)T/606
    B)T/605
    C)T/606
    D)T/609
    Answer: T/609
  • Q. What is shunting order number?
    A)T-806
    B)T-609
    C)T/A-602
    D)T-409
    Answer: T-806
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. TCAS full form is:
    A)Train Collision Avoidance Software
    B)Train Collision Advance System
    C)Train Complement Accident Software
    D)Traffic Collision Avoidance System
    Answer: Traffic Collision Avoidance System
  • Q. Where the caution indicator placed in BG if the engineering work is more than one days and train not to be require to stop at site?
    A)800 Meter
    B)1200 Meter
    C)1000 Meter
    D)500 Meter
    Answer: 800 Meter
  • Q. During TFC on single line, when line clear is obtained for more than one train, trains are run at an interval of ________ minutes.
    A)35
    B)20
    C)25
    D)30
    Answer: 30
  • Q. Where is the headquarters of Central Railway situated?
    A)Gwalior
    B)Mumbai (CST)
    C)Mumbai (Church Gate)
    D)Gorakhpur
    Answer: Mumbai (CST)
  • Q. ________ must be issued during thick or foggy weather.
    A)Reminder Caution Order
    B)Caution Order
    C)Nil Caution Order
    D)Minimum Caution Order
    Answer: Caution Order