More Questions on Indian Railway
- Q. To pick up the part load from the section, ________ authority is issued if the same loco pilot is proceeding.
A)T/407
B)T/409
C)T/408
D)T/406
Answer: T/409
- Q. If Goods Train catches fire ________ Must be preserved and sent to DCM.
A)Non-Samples
B)Samples & Seal Cards
C)Samples
D)None of these
Answer: Samples & Seal Cards
- Q. The Speaker of Lok Sabha also works as the ex – officio Chairperson of which of the following committees? 1)Railway Convention Committee 2)Business Advisory Committee 3)Public Account Committee Select the correct option from the codes given below:
A)1 & 3 Only
B)1 & 2 Only
C)2 Only
D)1, 2 & 3
Answer: 2 Only
- Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 3 Only
C)2 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. Semi-automatic signal is identified by ________.
A)Illuminated a marker
B)Marker
C)Semi marker
D)None of these
Answer: Illuminated a marker
- Q. EMU trains of harbour line has ________ number of wooden wedges.
A)6
B)2
C)4
D)8
Answer: 4
- Q. Validity of the competency certificate of the gateman is for ________ years.
A)9
B)10
C)3
D)4
Answer: 3
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 5 kg/cm2 of BP pressure in the engine.
A)6
B)10
C)8
D)4
Answer: 6
- Q. Distant signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Permissive
- Q. How many training institutions of Railways are in India?
A)Five
B)Three
C)Four
D)Six
Answer: Five
- Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
A)30
B)20
C)10
D)None of these
Answer: 30
- Q. Station limit is the portion between ________.
A)Both
B)Outermost signal
C)Innermost signal
D)None of these
Answer: Outermost signal
- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. What will be the maximum speed if leading cab of electric engine is defective and assistant driver is operating the train from rear cab?
A)40 kmph
B)15 kmph
C)30 kmph
D)Normal
Answer: 40 kmph
- Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
A)30 meters
B)20 meters
C)25 meters.
D)None of these
Answer: 30 meters
- Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
A)10
B)7
C)9
D)15
Answer: 7
- Q. SM shall inspect the personal store of Guard once in ________ months.
A)6
B)2
C)4
D)3
Answer: 3
- Q. A lorry shall be protected by banner flags and detonators if it remains stationary within the station yard for more than
A)20 meters
B)15 meters
C)10 meters
D)None of these
Answer: 15 meters
- Q. For extinguished home signal, Loco Pilot will be issued ________ authority form the station in rear in MACLS system.
A)16
B)20
C)12
D)10
Answer: 16
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State