Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.

Correct Answer

600

More Questions on Indian Railway

  • Q. After Uttar Pradesh, which among the following states has the maximum share in the total Route Kilometers of Indian Railways?
    A)Andhra Pradesh
    B)Rajasthan
    C)Maharastra
    D)Gujarat
    Answer: Rajasthan
  • Q. Joint sighting committee shall inspect the visibility of signals once in
    A)6 months
    B)A month
    C)3 months
    D)None of these
    Answer: 3 months
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. ________ must be issued during thick or foggy weather.
    A)Reminder Caution Order
    B)Caution Order
    C)Nil Caution Order
    D)Minimum Caution Order
    Answer: Caution Order
  • Q. Special instructions are issued by ________.
    A)Both
    B)COM
    C)Sr. DOM
    D)None of these
    Answer: COM
  • Q. Repeating signal shows ________ light in ON condition.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. Shatabdi Express train was started in ________.
    A)1990
    B)1984
    C)1988
    D)1985
    Answer: 1988
  • Q. If the SE (P.way) is not with the train, maximum speed at the spot of lurch shall be ________ km/h.
    A)10
    B)15
    C)20
    D)25
    Answer: 10
  • Q. If the points are set for main line, point indicator gives ________ light in the night.
    A)Yellow
    B)red
    C)Green
    D)White
    Answer: White
  • Q. If the advanced starter and IBS are defective, SM shall issue T/369(3b) authority with private number of ________ station to pass both advanced starter and IBS.
    A)Both
    B)Back
    C)Next
    D)None of these
    Answer: Next
  • Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)25 km
    Answer: 25 km
  • Q. What is the maximum speed of shunting of a petrol tank wagon?
    A)2 kmph
    B)15 kmph
    C)8 kmph
    D)5 kmph
    Answer: 8 kmph
  • Q. In the panel working for cancellation of route the number in the counter changes and white indication appears after
    A)50 seconds
    B)120 seconds
    C)90 seconds
    D)None of these
    Answer: 120 seconds
  • Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
    A)8
    B)10
    C)6
    D)None of these
    Answer: 6
  • Q. When the train has not cleared the fouling marks. Driver to give ________ whistle
    A)01 long
    B)03 long
    C)02 long
    D)None of these
    Answer: 03 long
  • Q. Maximum permissible speed is fixed by ________.
    A)MT
    B)CRS
    C)GM
    D)None of these
    Answer: CRS
  • Q. Interchange point of Central and Western railway is ________.
    A)Both
    B)Dadar
    C)Jalgaon
    D)None of these
    Answer: Both
  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
    A)6
    B)10
    C)12
    D)None of these
    Answer: 6

Leave a Comment