Q. While ordering ART/MRV each siren shall be sounded for ________ seconds.

Correct Answer

45

More Questions on Indian Railway

  • Q. Height gauge is for the safety of ________.
    A)Motor Trolley
    B)Trolley
    C)Ohe
    D)None of these
    Answer: Ohe
  • Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
    A)72
    B)24
    C)48
    D)None of these
    Answer: 72
  • Q. Normal condition of automatic stop signal is ________.
    A)Yellow
    B)Red
    C)Green
    D)None of these
    Answer: Green
  • Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
    A)40/15 kmph
    B)60/30 kmph
    C)35/20 kmph
    D)Normal speed
    Answer: 35/20 kmph
  • Q. Guard of passenger train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)35
    C)30
    D)35
    Answer: 30
  • Q. The first locomotive which was manufactured in Chittaranjan on
    A)Sep - 1949
    B)Nov - 1950
    C)Oct - 1950
    D)Oct - 1954
    Answer: Nov - 1950
  • Q. During accident or Engine failure in the mid section the report sent to SM must be signed by ________.
    A)Both
    B)GDR
    C)TDR
    D)None of these
    Answer: GDR
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
    A)2 & 3 Only
    B)1 & 3 Only
    C)2 Only
    D)1, 2 & 3
    Answer: 1, 2 & 3
  • Q. General Manger is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)None of these
    Answer: Railway Board
  • Q. How many members did the railway board had?
    A)4
    B)3
    C)5
    D)8
    Answer: 4
  • Q. If a military personnel is injured or killed in railway premises the DRM shall advise ________ New Delhi.
    A)Army Head Quarter
    B)Railway Board
    C)Zonal HQ
    D)None of these
    Answer: Army Head Quarter
  • Q. When a driver passing an automatic gate stop signal at ‘ON’ he must stop short of the gate of
    A)25 meters
    B)30 meters
    C)45 meters
    D)None of these
    Answer: None of these
  • Q. If loco pilot do not work in any section for more than a year, road learning for 2 trips by day and ________ trip by night is given.
    A)3
    B)1
    C)2
    D)4
    Answer: 2
  • Q. To start the train from a line with common starter, ________ authority is issued.
    A)T/512
    B)T/516
    C)T/517
    D)T/511
    Answer: T/512
  • Q. In case of home signal defective the speed of the train while passing over the points shall not be more than ________ km/h.
    A)15 km
    B)18 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. The train has parted
    A)_____00
    B)------0------0
    C)0___0
    D)00___
    Answer: ------0------0
  • Q. Which railway station entered Limca Book of Records 2018 for having all – women staff?
    A)Hazrat Nizamuddin railway station
    B)Chhatrapati Shivaji Terminus railway station
    C)Matunga railway station
    D)Kolkata railway station
    Answer: Matunga railway station
  • Q. India’s first Antyodaya Express has been launched by the Minister of Railways. The express will run between which stations?
    A)New Delhi and Kanyakumari
    B)Ernakulam and Howrah
    C)Sriganganagar and Tiruchirapalli
    D)Nizamuddin and Palakkad
    Answer: Ernakulam and Howrah
  • Q. Station in rear issues for passing Approach stop signal at ON
    A)T-369(1)
    B)T-509
    C)T-369(3b)
    D)Simple memo
    Answer: T-369(1)