More Questions on Indian Railway
- Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
A)Both
B)UP
C)Falling
D)None of these
Answer: UP
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters
B)100 meters
C)150 meters
D)None of these
Answer: 100 meters
- Q. Which state government has recently signed MoU with Indian Railways to expand green cover?
A)Maharashtra
B)Kerala
C)Uttar Pradesh
D)Rajasthan
Answer: Maharashtra
- Q. Shunting speed of 5 box wagons is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 2
- Q. Running staff should not normally be away from head quarters for more than hours at a stretch.
A)72
B)24
C)48
D)None of these
Answer: 72
- Q. Used for A self propelled vehicle repairs in OHE is
A)Moped Trolley
B)Tower wagon
C)Ladder Trolley
D)None of these
Answer: Tower wagon
- Q. In token territory, ________ is authority for shunting up to FSS.
A)T/806
B)Shunt Mental Token+T/806
C)Shunt Mental
D)None of these
Answer: Shunt Mental Token+T/806
- Q. Hand shunting speed is ________
A)8 kmph
B)5 kmph
C)10 kmph
D)None of these
Answer: 5 kmph
- Q. Goods train without brake van shall not be run during ________.
A)CCF
B)BCF
C)ACF
D)None of these
Answer: ACF
- Q. Which of the following is the easternmost division of the Indian Railways?
A)Rangiya
B)Tinsukia
C)Lumding
D)Katihar
Answer: Tinsukia
- Q. In automatic block system SL, the signal that can be dispensed with is
A)Automatic Stop signal
B)Home
C)Starter
D)None of these
Answer: Automatic Stop signal
- Q. Maximum number of explosive unit wagons in a mixed train is
A)3
B)5
C)7
D)None of these
Answer: 3
- Q. Point indicator shows ________ light when the points are set for loop line.
A)S&T (T/350)
B)S&T (T/351)
C)S&T (T/352)
D)S&T (T/315)
Answer: S&T (T/351)
- Q. For disconnection of points S&T official must issue form ________
A)T/B 351
B)T/351
C)T/A 351
D)None of these
Answer: T/351
- Q. Indian Railway will be provided a device to their Gang Men which would be wireless enabled and will intimate them about approaching trains. The Device will be called:
A)Shaktimaan
B)Surakhsha
C)Rail Rakshak
D)Rakshak
Answer: Rakshak
- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. Signal sighting committee consists of TI, SI/PWI and ________.
A)T/C 912
B)T/B 912
C)T/D 912
D)T/A 912
Answer: T/D 912
- Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
A)6
B)10
C)12
D)None of these
Answer: 6
- Q. Where is the headquarters of Central Railway situated?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State