More Questions on Indian Railway
- Q. Signal has extinguished.
A)------00
B)___0___
C)0___0
D)00___
Answer: ------00
- Q. DRM permission is necessary when hand shunting outside station section takes place in gradient
A)ST 1-260
B)ST 1-600
C)1-400
D)None of these
Answer: ST 1-600
- Q. Minimum depth of space for wheel flange from rail level in BG is
A)3"
B)2"
C)1 (1/2)"
D)None of these
Answer: 1 (1/2)"
- Q. The speed of cycle/moped trolley is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. ________ brake is not provided in the coach of passenger train.
A)Minor
B)Hand
C)Non-hand
D)None of these
Answer: Hand
- Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi
B)Hyderabad
C)Chennai
D)Kolkata
Answer: Hyderabad
- Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
A)ALP
B)Driver
C)Guard
D)None of these
Answer: Guard
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Q. Length of BOXN Wagon is
A)10.71 meters
B)8.67 meters
C)9.78 meters
D)None of these
Answer: 10.71 meters
- Q. In which Governor – General’s reign railway lines in India were established?
A)Lord Kenning
B)Lord William Bentick
C)Lord Cornwallis
D)Lord Dalhousie
Answer: Lord Dalhousie
- Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
A)01 month
B)04 month
C)02 month
D)03 Months
Answer: 02 month
- Q. If outside the station limits the distance between two trains is ________ in averted collusion, such occurrence may not be treated as an averted collision.
A)100 meter
B)200 meter
C)250 meter
D)400 meters and more
Answer: 400 meters and more
- Q. Hand shunting speed is ________
A)8 kmph
B)5 kmph
C)10 kmph
D)None of these
Answer: 5 kmph
- Q. when form T/D 912 is issued the driver shall not exceed the speed
A)25 kmph
B)15 kmph
C)20 kmph
D)None of these
Answer: 25 kmph
- Q. Normal condition of automatic stop signal is ________.
A)Yellow
B)Red
C)Green
D)None of these
Answer: Green
- Q. During total interruption of communication on signal line. The speed of LE to establish communication is ________ kmph during day and clear weather.
A)20
B)10
C)15
D)None of these
Answer: 15
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Apart from the regular store, Guard of material train must also possess ________.
A)Third aid box
B)First aid box
C)Second aid box
D)None of these
Answer: First aid box
- Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
A)40/15 kmph
B)60/30 kmph
C)35/20 kmph
D)Normal speed
Answer: 35/20 kmph
- Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
A)C & W
B)Engineering
C)Mechanical
D)None of these
Answer: Mechanical