Q. What will be the maximum speed of B-Class ODC in Broad guage?
A
40 kmph
B
15 kmph
C
25 kmph
D
75 kmph
Correct Answer
40 kmph
More Questions on Indian Railway
Q. When was the Central Railway established?
A)14th April 1951 B)5th Nov 1951 C)14th Nov 1951 D)16th August, 1951
Answer: 5th Nov 1951
Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section B)Station diary C)Diary D)None of these
Answer: Station diary
Q. The time taken for formation of a goods train in flat yard is
A)3 kmph B)2 hrs C)1 hr D)None of these
Answer: 2 hrs
Q. The time limit for starting BD special during day is ________.
A)30 meters B)20 meters C)15 meters D)40 meters
Answer: 30 meters
Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
A)Save collision B)Violation of block rules C)Passingn danger signal D)All of above
Answer: All of above
Q. Consider the following statements with respect to Railway Freight corridor projects in India: 1)The Eastern freight corridor extends from Dankuni in Bengal to Ludhiana in Punjab and it is funded by World Bank 2)The Western freight corridor extends from Jawaharlal Nehru port in Mumbai to Dadri near Delhi and it is funded by Japan International Cooperation Agency Which of the above is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: Both 1 & 2
Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
A)8 kmph B)10 kmph C)15 kmph D)None of these
Answer: 15 kmph
Q. Minimum distance apart of refuges in Tunnels in BG is (at present)
A)200 meters B)100 meters C)150 meters D)None of these
Answer: 100 meters
Q. Knowledge of subsidiary rules is examined by ________ if train working staff of another Railway is required to work on our Railway.
A)LI B)TI C)CI D)None of these
Answer: TI
Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
A)1200 B)600 C)800 D)None of these
Answer: 600
Q. The speed of cycle/moped trolley is
A)20 kmph B)15 kmph C)10 kmph D)None of these
Answer: 10 kmph
Q. ________ form shall be used by GDR when a person falls out of train injured or killed.
A)ACC4 B)ACC2 C)ACC3 D)None of these
Answer: ACC4
Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
A)Madhya Pradesh B)Tamil Nadu C)West Bengal D)Punjab
Answer: West Bengal
Q. Weight required minimum for testing IC Apparatus is the
A)7 - 10 kg B)6 kg C)10 kg D)None of these
Answer: 7 - 10 kg
Q. Under approved special instructions, Distant signal can be placed along with the
A)Both B)Last Stop C)First Stop D)None of these
Answer: Last Stop
Q. To start a train from unsignalled line ________ authority is issued.
A)T/511 B)T/512 C)T/515 D)T/521
Answer: T/511
Q. Duplicate signal is ________.
A)Co-acting signal B)Home Signal C)Warner Signal D)None of these
Answer: Co-acting signal
Q. Maximum speed of shunting of wagons with explosives is ________ km/h.
A)15 B)8 C)10 D)20
Answer: 8
Q. Gorakhpur which has the longest railway platform in the world is located in which of the following states?