- Q. In the enroute, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Q. If the driver does not received all right signal from the guard, he must call for is by giving.
A)On long
B)Two sharp whistles
C)One long one short.
D)None of these
Answer: Two sharp whistles
- Q. “C” class ODC is run with the permission of ________.
A)Head Quarter
B)DOM
C)CRS
D)None of these
Answer: CRS
- Q. The number of Train examination report is ________.
A)T/436
B)T/431
C)T/432
D)T/436
Answer: T/431
- Q. Record of caution order is kept for ________ months.
A)9
B)10
C)5
D)12
Answer: 12
- Q. D class station board is placed ________ meters from the end of the platform.
A)600
B)400
C)500
D)800
Answer: 500
- Q. Isolation shall be provided at an interlocked station when the speed is
A)Above 50 kmph
B)50 kmph
C)75 kmph
D)None of these
Answer: Above 50 kmph
- Q. In case of goods train without brake van, Guard is exempted from ________.
A)Whistling
B)ARS
C)Tail Lamp
D)None of these
Answer: ARS
- Q. While shunting a complete train from one line to the other, ________ shall be present in the brakevan.
A)ALP
B)Driver
C)Guard
D)None of these
Answer: Guard
- Q. Number of train signal register of single line is ________.
A)T/166 B
B)T/136 A
C)T/137 B
D)T/135
Answer: T/137 B
- Q. The Speaker of Lok Sabha also works as the ex – officio Chairperson of which of the following committees? 1)Railway Convention Committee 2)Business Advisory Committee 3)Public Account Committee Select the correct option from the codes given below:
A)1 & 3 Only
B)1 & 2 Only
C)2 Only
D)1, 2 & 3
Answer: 2 Only
- Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
A)6
B)2
C)4
D)8
Answer: 2
- Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI
B)CI
C)LI
D)TI
Answer: PWI
- Q. Station Working Rules of Non-interlocked station is signed by ________.
A)AOM & ADEN
B)DOM & DEN
C)Sr. DOM & Sr. DEN
D)None of these
Answer: Sr. DOM & Sr. DEN
- Q. On which speed BG engine shall be run while speedometer is defective during run?
A)25 kmph
B)50 kmph
C)40 kmph
D)Maximum 10% less of MPS
Answer: Maximum 10% less of MPS
- Q. Distance between outer and home signals on a single line is ________ meters when there is advanced starter or SLB in the opposite direction.
A)540
B)900
C)580
D)570
Answer: 580
- Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
A)2 gangman
B)JE(Pway)
C)One gangman
D)None of these
Answer: JE(Pway)
- Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40
B)20
C)30
D)None of these
Answer: 30
- Q. Semi-automatic signal is identified by ________.
A)Illuminated a marker
B)Marker
C)Semi marker
D)None of these
Answer: Illuminated a marker
- Q. In MAUQ area where signal arm home with isolation is provided the speed is over point is
A)Unrestricted
B)75 kmph
C)50 kmph
D)None of these
Answer: 75 kmph