Q. During power failure in automatic block section, on which authority relief engine will proceed?
A
TC-912
B
TA-912
C
TB-912
D
TD-912
Correct Answer
TC-912
More Questions on Indian Railway
Q. Yearly goods stock census is taken on ________.
A)30st November B)31st December C)31st October D)31st March
Answer: 30st November
Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
A)Shunt B)Repeating C)Call-on D)None of these
Answer: Repeating
Q. Guard of goods train shall sign on ________ minutes before the actual departure of the train.
A)40 B)45 C)30 D)35
Answer: 45
Q. At which of the following places Diesel Component Works is established?
A)Perambur B)Jamshedpur C)Patiala D)Varanasi
Answer: Patiala
Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
A)Only 2 & 3 B)Only 1 C)Only 1 & 2 D)Only 3
Answer: Only 3
Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
A)Authority B)Private Number C)Cuation Number D)None of these
Answer: Private Number
Q. The length of sand hump is about ________ feet.
A)170 B)150 C)120 D)170
Answer: 170
Q. Wagon with livestock shall be attached ________ position from engine on a goods train.
A)Third B)First C)Second D)None of these
Answer: Second
Q. What was the main source of earning of Railway?
A)Catering B)Goods fair C)Passenger fair D)None of thses
Answer: Goods fair
Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
A)Green B)White C)Red D)NIL
Answer: NIL
Q. If the motorman of EMU passes the automatic stop signal at ON, he shall proceed at a speed of 15/8 km/h and stop the train before ________ meters of the obstruction on the track.
A)80 B)70 C)75 D)85
Answer: 75
Q. D class station board is placed ________ meters from the end of the platform.
A)600 B)400 C)500 D)800
Answer: 500
Q. Night duty should not normally be performed by the running staff for more than ________ nights at a stretch.
A)6 B)10 C)12 D)None of these
Answer: 6
Q. The maximum distance covered by a patrol man should not normally exceed
A)15 KM B)10 KM a day C)12 KM D)None of these
Answer: 10 KM a day
Q. Speed of Train over points shall be ________ Km/h when the points are clamped and padlocked after disconnection of points.
A)30 B)20 C)25 D)15
Answer: 15
Q. When did the first ignition engine develop?
A)1900 B)1890 C)1892 D)1904
Answer: 1892
Q. Dead engine is attached at ________ position on a Mail / Express train.
A)Both B)Engine to engine C)Next to engine D)None of these