More Questions on Indian Railway
- Q. When baking a train from one line to the other line, it is necessary to present the train guard.
A)Break van
B)Point
C)Station
D)Any Place
Answer: Break van
- Q. To start a train from unsignalled line ________ authority is issued.
A)T/511
B)T/512
C)T/515
D)T/521
Answer: T/511
- Q. Which authority shall be received from station in rear while colour light distant signal is blank-off?
A)T/A409
B)T/369(1)
C)T/409
D)No Need of any Authority
Answer: T/369(1)
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. The speed of the train over neutral section shall not be less than ________ kmph
A)40
B)20
C)30
D)None of these
Answer: 30
- Q. Patrolman becoming overdue during night.
A)40 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 10 kmph
- Q. Loss of railway property of Rs. more than 2 Crores is treaed as ________ accident.
A)Both
B)Minor
C)Serious
D)None of these
Answer: Serious
- Q. How many institutions do give suggestions for railways technology?
A)Three
B)One
C)Two
D)Four
Answer: Two
- Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A)Yellow
B)RED
C)Green
D)None of these
Answer: RED
- Q. To attach the 12 coach EMU rake, ________ units are to be attached.
A)8
B)5
C)6
D)4
Answer: 4
- Q. Which of the following has been declared the cleanest railway station in the A1 category, as per 2018 cleanliness survey for Indian Railways?
A)Jodhpur
B)Jaipur
C)Tirupati
D)Warangal
Answer: Jodhpur
- Q. Rake link book-let is prepared by COM and ________.
A)DPO
B)CPTM
C)CPO
D)None of these
Answer: CPTM
- Q. What is the position of the Indian Railway under one management are also credited with having a multi gauge and multi traction system?
A)Third
B)First
C)Second
D)Fourth
Answer: Second
- Q. In TALQ signalling system, ________ signal will be treated as defective if home signal becomes defective.
A)Hand
B)Outer
C)Call-On
D)Non eof these
Answer: Outer
- Q. When the calling on signal is taken off, it indicates the loco pilot to proceed ________ and be prepared to stop short of any obstruction.
A)Defective
B)Caution
C)Cautiously
D)None of these
Answer: Cautiously
- Q. On DL the speed of the train during total interruption of communication is ________ kmph when the view ahead is clear during day and night.
A)25
B)20
C)15
D)None of these
Answer: 25
- Q. Which railway station has become the India’s first station to run by all women staff?
A)Chhatrapati Shivaji Terminus railway station
B)Matunga railway station
C)Hazrat Nizamuddin railway station
D)Kolkata railway station
Answer: Matunga railway station
- Q. When a running line is occupied ________ entry must be made in TSR.
A)Yellow Ink
B)Red Ink
C)Green Ink
D)None of these
Answer: Red Ink
- Q. Section controller shall transmit the correct time at ________ hours daily to all the stations.
A)16
B)20
C)12
D)10
Answer: 16
- Q. Dead engine is attached at ________ position on a Mail / Express train.
A)Both
B)Engine to engine
C)Next to engine
D)None of these
Answer: Next to engine
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State