Q. A lorry shall be protected by banner flags and detonators if it remains stationary within the station yard for more than

Correct Answer

15 meters

More Questions on Indian Railway

  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. When was the first train steamed off in India?
    A)1875
    B)1848
    C)1853
    D)1880
    Answer: 1853
  • Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
    A)Habibganj railway station
    B)Farukhnagar railway station
    C)Safdarjung railway station
    D)Mumbai Central railway station
    Answer: Safdarjung railway station
  • Q. Load table is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Maximum number of explosive unit wagons in a mixed train is
    A)3
    B)5
    C)7
    D)None of these
    Answer: 3
  • Q. Ruling gradient of the division is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Which authority shall be received to perform shunting beyond LSS at station of double line equipped with
    A)T/A 602
    B)T-806
    C)T/A 802
    D)T-806 A
    Answer: T-806
  • Q. Who invented the railway engine?
    A)James Watt
    B)Charles Babbage
    C)Isaac Newton
    D)George Stephenson
    Answer: George Stephenson
  • Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
    A)Both 1 & 2
    B)1 Only
    C)2 Only
    D)Neither 1 nor 2
    Answer: 2 Only
  • Q. What will be the speed of second train running on T/C 602?
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: Normal speed
  • Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
    A)15
    B)10
    C)5
    D)20
    Answer: 20
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. The time limit for starting BD special during day is ________.
    A)30 meters
    B)20 meters
    C)15 meters
    D)40 meters
    Answer: 30 meters
  • Q. The zone with the minimum length is
    A)South - East Railway
    B)North - Eastern Railway
    C)North - Eastern Frontier Railway
    D)South - Central Railway
    Answer: North - Eastern Frontier Railway
  • Q. Signal sighting committee shall submit its report on form ________.
    A)T/101 B
    B)T/103 B
    C)T/102 B
    D)None of these
    Answer: T/102 B
  • Q. Which authority shall be received to proceed for obstructed block section due to an Accident?
    A)T/A 602
    B)T-1425
    C)T-369(3b)+P.No.
    D)Simple memo
    Answer: T/A 602
  • Q. How much overlap is required to be off an Automatic stop signal on double line Automatic block system?
    A)90 meters
    B)180 meters
    C)120 meters
    D)Zero
    Answer: Zero
  • Q. Normally maximum gradient in station yards in BG is (at present)
    A)1 in 1000
    B)1 in 260
    C)1 - 400
    D)None of these
    Answer: 1 - 400