Q. At what time the first train in India (and in Asia) flagged off?

Correct Answer

Saturday, 03:35 PM

More Questions on Indian Railway

  • Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
    A)DOM
    B)AOM(G)
    C)AOM(Chg)
    D)None of these
    Answer: AOM(G)
  • Q. When two trollies are working in section the gap between the two must be
    A)400 Meters
    B)100 meters
    C)200 meters
    D)None of these
    Answer: 100 meters
  • Q. In case of continuous category/preparatory and /or complementary work between 15 and 45 meters should be treated as ________.
    A)30 meters
    B)20 meters
    C)25 meters.
    D)None of these
    Answer: 30 meters
  • Q. If the vehicles escaped on right line on a double line ________ bell code is given to the station in advance.
    A)0000-000
    B)000000-0000 0
    C)00000-0
    D)0000-0000
    Answer: 000000-0000 0
  • Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
    A)T/369(4b)
    B)T/369(3b)
    C)T/369(2B)
    D)T/369(5b)
    Answer: T/369(3b)
  • Q. Which type Authority to proceed shall be used at without starter signal station on single line?
    A)Any one
    B)Non Tangible
    C)Tangible
    D)None of these
    Answer: Tangible
  • Q. When the water rises above ballast level, but below rail level in cause ways, train may be permitted to run by
    A)2 gangman
    B)JE(Pway)
    C)One gangman
    D)None of these
    Answer: JE(Pway)
  • Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. Caution order is carried forward at stations on ________ at 09:00 hours.
    A)Monday
    B)Tueday
    C)Sunday
    D)None of these
    Answer: Monday
  • Q. The manufacturing of steam engine in Chittranjan Locomotive Works was stopped in
    A)1972
    B)1974
    C)1961
    D)1973
    Answer: 1972
  • Q. At station where it is not possible to exchange the signal between Guard and Loco Pilot due to curvature the guard shall ask the LP to start the train on ________.
    A)Walkie-Talkie
    B)Walkie
    C)VHF
    D)None of these
    Answer: Walkie-Talkie
  • Q. If Goods Train catches fire ________ Must be preserved and sent to DCM.
    A)Non-Samples
    B)Samples & Seal Cards
    C)Samples
    D)None of these
    Answer: Samples & Seal Cards
  • Q. Corridor block is mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. In which class overlapping section is found?
    A)C-Class
    B)A-Class
    C)B-Class
    D)D-Class
    Answer: C-Class
  • Q. In Automatic Block system , in BG when there is obstruction in the adjacent line, driver to protect the adjacent line first by placing one detonator at not less than ________ , metres.
    A)1200
    B)600
    C)800
    D)None of these
    Answer: 600
  • Q. How much block overlap is required at the station equipped with MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. Signals are treated as ________ if connected points become defective.
    A)Both
    B)Defective
    C)Restricted
    D)None of these
    Answer: Defective
  • Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
    A)Single white
    B)Yellow
    C)Two White parallel
    D)No light
    Answer: No light
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. Adequate distance mentioned in the automatic block system is ________ meters.
    A)105
    B)110
    C)120
    D)115
    Answer: 120

Leave a Comment