- Q. If the driver does not received all right signal from the guard, he must call for is by giving.
A)On long
B)Two sharp whistles
C)One long one short.
D)None of these
Answer: Two sharp whistles
- Q. Which of the following is the largest railway junction in India?
A)Mathura
B)Delhi
C)Bhatinda
D)Allahabad
Answer: E
- Q. Only ________ persons other than the motor man/guard are authorized to travel in the cab in EMU
A)6
B)2
C)4
D)8
Answer: 2
- Q. What is the maximum speed of shunting of a petrol tank wagon?
A)2 kmph
B)15 kmph
C)8 kmph
D)5 kmph
Answer: 8 kmph
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. Time taken by train running at MPS is called as ________.
A)Normal running time
B)Long time
C)Minimum running time
D)None of these
Answer: Minimum running time
- Q. When the points are set for loop line, the point indicator shows no target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. On which authority advance starter may be passed during shunting operation in its on position?
A)On hand signal
B)T-369(3b)
C)Written memo
D)T-806
Answer: T-806
- Q. What is the length of North – Eastern Frontier Railway (NEFR)?
A)4290 km
B)4300 Km
C)3700 Km
D)5298 km
Answer: 3700 Km
- Q. Shatabdi Express train was started in ________.
A)1990
B)1984
C)1988
D)1985
Answer: 1988
- Q. Consider the following statements about Operating Ratio in Indian Railways: 1)The higher the operating ratio of Indian Railways the better is the condition of Indian Railways. 2)Operating ratio of Indian Railways is high on account of social service obligation imposed in Budget. Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: 2 Only
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. What should be done by guard if train entering in block section without authority to proceed?
A)Protect the Train
B)Stop the Train
C)Inform to SM
D)All of above
Answer: All of above
- Q. Launched World’s first Bio Toilet Train. Named as:
A)Dirubharg Rajdhani Express
B)Deen Dayalu Express
C)Himsagar janshatabdi Express
D)Shatabdi Express
Answer: Dirubharg Rajdhani Express
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. If the block instrument becomes defective on a double line, ________ signal is also treated as defective.
A)Stop signal
B)Fisrt Stop signal
C)Last stop signal
D)None of these
Answer: Last stop signal
- Q. It is a Python Rake.
A)15 kmph
B)60 kmph
C)25 kmph
D)Normal speed
Answer: 60 kmph
- Q. ISMD must be attached always
A)In the middle
B)Next to Engine
C)In rear
D)None of these
Answer: Next to Engine
- Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph
B)Normal speed
C)15 kmph
D)60 kmph
Answer: 60 kmph
- Q. BD special shall be turned out during night within
A)30 meters
B)25 meters
C)45 meters
D)None of these
Answer: 45 meters