Q. Max. Speed of special train with 132 tonne bogie well wagon shall be ________ km/h.

Correct Answer

30

More Questions on Indian Railway

  • Q. Signals are treated as ________ if connected points become defective.
    A)Both
    B)Defective
    C)Restricted
    D)None of these
    Answer: Defective
  • Q. Consider the following steps in Budget Procedure in India: 1)The demands for grants of various ministries and departments including railways are considered by the concerned standing committees 2)Broad contours of the budget and the principles and policies underlying it are discussed. 3)A cut motion is moved in the Lok Sabha 4)Budget is presented in the House. Which among the following is the correct sequence of the above steps?
    A)4 2 1 3
    B)1 2 3 4
    C)1 2 4 3
    D)3 1 4 2
    Answer: 4 2 1 3
  • Q. Maximum No. of ________ coaches can be attached in rear of SLR of passenger train.
    A)4
    B)2
    C)3
    D)6
    Answer: 2
  • Q. Not more than ________ persons including trollyman shall go on a 6 HP motory trolly.
    A)9
    B)10
    C)3
    D)4
    Answer: 10
  • Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
    A)12 hours
    B)04 hours
    C)08 hours
    D)16 hours
    Answer: 16 hours
  • Q. Shunt signal is a ________ signal.
    A)Both
    B)Subsidiary
    C)Ordinary
    D)None of these
    Answer: Subsidiary
  • Q. What is the position of the Indian Railway in the world according to the length of rail lines?
    A)Third
    B)First
    C)Second
    D)Fourth
    Answer: Fourth
  • Q. While pushing back, train shall be stopped at ________ stop signal.
    A)Slip
    B)Outermost
    C)Rear most
    D)None of these
    Answer: Outermost
  • Q. Which of the following will become the first central paramilitary force to opt for e – ticketing instead of Railway warrant?
    A)Central Reserve Police Force
    B)Assam Rifles
    C)National Security Guard
    D)Sashastra Seema Bal
    Answer: National Security Guard
  • Q. How many systems of working in Indian Railways for train operation?
    A)8
    B)6
    C)7
    D)9
    Answer: 6
  • Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
    A)Both
    B)UP
    C)Falling
    D)None of these
    Answer: UP
  • Q. Weight required minimum for testing IC Apparatus is the
    A)7 - 10 kg
    B)6 kg
    C)10 kg
    D)None of these
    Answer: 7 - 10 kg
  • Q. During power failure in automatic block section, on which authority relief engine will proceed?
    A)TC-912
    B)TA-912
    C)TB-912
    D)TD-912
    Answer: TC-912
  • Q. Shunting to be done in D/L block section
    A)T-806
    B)PLCT
    C)T-369(3b)
    D)Simple memo
    Answer: T-806
  • Q. The number of Train examination report is ________.
    A)T/436
    B)T/431
    C)T/432
    D)T/436
    Answer: T/431
  • Q. How many members did the railway board had?
    A)4
    B)3
    C)5
    D)8
    Answer: 4
  • Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
    A)15
    B)10
    C)5
    D)20
    Answer: 20
  • Q. On the electrified area in sections at 25 KV A.C., when the gross clearance is between 390 MM and 340 MM the speed must be
    A)8 kmph
    B)10 kmph
    C)15 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Track maintenance machine is permitted to work during
    A)Day clear weather
    B)Day
    C)Day and Night
    D)None of these
    Answer: Day and Night
  • Q. The Driver of goods train must stop his train as close as possible to ________.
    A)Both
    B)Starter
    C)Advance Starter
    D)None of these
    Answer: Starter

Leave a Comment