- Q. When was the North-Eastern frontier Railway (NFR) established?
A)2nd January, 1956
B)15th January, 1958
C)15th January, 1955
D)14th April, 1952
Answer: 15th January, 1958
- Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
A)DOM
B)AOM(G)
C)AOM(Chg)
D)None of these
Answer: AOM(G)
- Q. While stabling box load, hand brakes of ________ wagons at both ends shall be pinned down.
A)7 - 7
B)8 - 8
C)6 - 6
D)8 - 8
Answer: 6 - 6
- Q. At which of the following places Diesel Component Works is established?
A)Perambur
B)Jamshedpur
C)Patiala
D)Varanasi
Answer: Patiala
- Q. Consider the following: 1)Real Estate Investment Trust 2)Railway operation 3)Atomic Energy As of now, there is no FDI in India, in which of above sector(s)?
A)1, 2 & 3
B)1 Only
C)1 & 2 Only
D)None
Answer: 1, 2 & 3
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
A)Shunt signal
B)Calling-on Signal
C)Home Signal
D)None of these
Answer: Home Signal
- Q. After Uttar Pradesh, which among the following states has the maximum share in the total Route Kilometers of Indian Railways?
A)Andhra Pradesh
B)Rajasthan
C)Maharastra
D)Gujarat
Answer: Rajasthan
- Q. Headquarters of which one among the following Railway Zones in India is situated at the highest elevation from the mean sea level?
A)South Western Railway
B)East Central Railway
C)South Eastern Railway
D)West Central Railway
Answer: South Western Railway
- Q. Which authority shall be issued to pass a starter signal during advanced starter single is failed and starter is interlocked with Ad. Starter at a station equipped with single line token less block?
A)Memo + Hand Signal
B)T-369(3b)
C)PLCT
D)Starter should be taken off
Answer: T-369(3b)
- Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
A)Station Traffic
B)Movement of traffic
C)None of Traffic
D)None of these
Answer: Movement of traffic
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
A)15 km
B)8 km
C)10 km
D)25 km
Answer: 25 km
- Q. Which state government has recently signed MoU with Indian Railways to expand green cover?
A)Maharashtra
B)Kerala
C)Uttar Pradesh
D)Rajasthan
Answer: Maharashtra
- Q. Mixed and Goods trains worked with vacuum throughout, the following number of vehicles can be attached in rear of BV.
A)Not more than two bogies or their equivalent
B)Two Bogies
C)04 four wheelers only
D)None of these
Answer: Not more than two bogies or their equivalent
- Q. When was the first underground railway (Metro Railway) started?
A)1984
B)1982
C)1989
D)1992
Answer: 1984
- Q. Impact speed of shunting of one box wagon is ________ km/h.
A)6
B)2
C)5
D)8
Answer: 5
- Q. At the starting station, passenger train must have ________ kg/cm2 of FP pressure and 4.8 kg/cm2 of BP pressure in the brake van.
A)5
B)4
C)2
D)8
Answer: 5
- Q. Motor coach is a ________ coach.
A)Self Minor
B)Self Propelled
C)Self System
D)None of these
Answer: Self Propelled
- Q. The speed of Motor Trolly over points and crossings is
A)15 kmph
B)10 kmph
C)8 kmph
D)None of these
Answer: 15 kmph