- Q. To receive the train which has entered the block section without authority to proceed, SM to issue ________ and pilot the train or by signal post telephone.
A)T/369(B)
B)T/369(3b)
C)T/369(2b)
D)None of these
Answer: T/369(2b)
- Q. Through which of the following group of states does the Konkan Railways run?
A)Maharashtra - Karnataka - Kerala - Tamil Nadu
B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
C)Maharashtra - Karnataka - Goa
D)Karnataka - Goa - Kerala - Tamil Nadu
Answer: Maharashtra - Karnataka - Goa
- Q. In which of the following cities, the first subway train was started?
A)Kolkata
B)Mumbai
C)Delhi
D)Chennai
Answer: Kolkata
- Q. If the patrol man does not turn up within ________ minutes, he will be treated as delayed.
A)15
B)10
C)20
D)40
Answer: 15
- Q. When a motor trolley is in charge of office, the motor trolley can go upto outer most facing points after waiting for ________ minutes.
A)20
B)10
C)15
D)25
Answer: 10
- Q. In which country was flange wheel invented?
A)Europe
B)Germany
C)Japan
D)Russia
Answer: Germany
- Q. The Speaker of Lok Sabha also works as the ex – officio Chairperson of which of the following committees? 1)Railway Convention Committee 2)Business Advisory Committee 3)Public Account Committee Select the correct option from the codes given below:
A)1 & 3 Only
B)1 & 2 Only
C)2 Only
D)1, 2 & 3
Answer: 2 Only
- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM
- Q. Motorman of EMU shall give ________ bell code while passing A marker lit gate signal in ON position.
A)0-00
B)00-00
C)000-000
D)None of these
Answer: 00-00
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. First Train started in India?
A)1853
B)1851
C)1852
D)1854
Answer: 1853
- Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00
B)000-000
C)00-00
D)000-000-000
Answer: 000-000
- Q. When unsafe condition of river bund is reported. CO to be issued for speed for day is
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. During TSL working in thick and foggy weather, speed of the first train shall not exceed ________ km/h.
A)15 km
B)8 km
C)10 km
D)25 km
Answer: 25 km
- Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
A)01 month
B)04 month
C)02 month
D)03 Months
Answer: 02 month
- Q. At a station in gradient in 1-260 or steeper, during shunting the Engine must be on the ________ gradient.
A)Both
B)UP
C)Falling
D)None of these
Answer: UP
- Q. Upto how many track machine shall be allowed for working within the block section?
A)8
B)2
C)5
D)10
Answer: 5
- Q. If the Advanced starter is defective and IBS is working, SM shall issue ________ authority with private number of same station to pass the advanced starter.
A)T/369(4b)
B)T/369(3b)
C)T/369(2B)
D)T/369(5b)
Answer: T/369(3b)
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. Which of the following committee gave recommendations on separation of Policy – making, Regulation & Operations in Indian Railways and setting up of a Railway Regulatory Authority of India (RRAI)?
A)Rajinder Sachar Committee
B)Bibek Deberoy committee
C)Rangarajan committee
D)Mihir Shah Committee
Answer: Bibek Deberoy committee