Q. The length of long welded rail under Indian conditions should be about

Correct Answer

1 km

More Questions on Indian Railway

  • Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
    A)Gate opened and point is not set for main line
    B)Gate closed and point is set for main line
    C)Gate opened and point is set for main line
    D)Defective signal
    Answer: Defective signal
  • Q. How many Class of Accident?
    A)20
    B)14
    C)16
    D)None of these
    Answer: 16
  • Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
    A)NTPC
    B)ONGC
    C)GAIL India
    D)IOCL
    Answer: GAIL India
  • Q. Sounding of 5 hooters means ________.
    A)ART, MRV required at out station
    B)ART
    C)MRV
    D)None of these
    Answer: ART, MRV required at out station
  • Q. Rake link book-let is prepared by COM and ________.
    A)DPO
    B)CPTM
    C)CPO
    D)None of these
    Answer: CPTM
  • Q. Authority to pass IBS has been issued from station in rear.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. When a goods train is working without brake can the speed is
    A)25 kmph by day and 15 kmph by night
    B)15 kmph
    C)25 kmph
    D)None of these
    Answer: None of these
  • Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?
    A)Sutlej
    B)Chenab
    C)Jhelum
    D)Indus
    Answer: Chenab
  • Q. If the driver does not received all right signal from the guard, he must call for is by giving.
    A)On long
    B)Two sharp whistles
    C)One long one short.
    D)None of these
    Answer: Two sharp whistles
  • Q. The Mughalsarai junction has recently renamed as Deen Dayal Upadhyaya railway station. It is located in which state?
    A)Uttarakhand
    B)Bihar
    C)Uttar Pradesh
    D)Delhi
    Answer: Uttar Pradesh
  • Q. Colour of the semaphore repeating signal is ________.
    A)Yellow
    B)Red
    C)White
    D)Green
    Answer: Yellow
  • Q. When an accident occurs the GDR must their report to next SM in form.
    A)ACC5
    B)ACC1
    C)ACC2
    D)ACC3
    Answer: ACC3
  • Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
    A)25
    B)30
    C)20
    D)50
    Answer: 30
  • Q. How much block overlap is required at the station equipped with single line MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. At what time the first train in Indian (and in Asia) flagged off?
    A)Saturday, 03:35 PM
    B)Saturday, 8:50 AM
    C)Sunday, 10:00 AM
    D)Sunday, 02:30 PM
    Answer: Saturday, 03:35 PM
  • Q. When was the construction work for the first Railway line Started?
    A)1823
    B)1821
    C)1828
    D)1830
    Answer: 1821
  • Q. Guard of passenger train shall sign on ________ minutes before the actual departure of the train.
    A)40
    B)35
    C)30
    D)35
    Answer: 30
  • Q. What is the speed of second train on double line section running on T/A602?
    A)10 kmph
    B)20 kmph
    C)15 kmph
    D)8 kmph
    Answer: 8 kmph
  • Q. Guard’s assistance is required by LP.
    A)0
    B)0
    C)0
    D)____
    Answer: 0
  • Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
    A)20 kmph
    B)15 kmph
    C)10 kmph
    D)None of these
    Answer: 15 kmph