Q. The length of long welded rail under Indian conditions should be about

Correct Answer

1 km

More Questions on Indian Railway

  • Q. What is maximum width of coaching stock in BG?
    A)3250 mm
    B)3050 mm
    C)3200 mm
    D)3300 mm
    Answer: 3250 mm
  • Q. Which of the following is India’s first green railway corridor?
    A)Chennai to Manamadurai
    B)Barmer to Munawab
    C)Manamadurai to Rameswaram
    D)Puri to Visakhapatnam
    Answer: Manamadurai to Rameswaram
  • Q. The number of line clear ticket in up direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/B 1425
    Answer: T/C 1425
  • Q. The number of line clear ticket in down direction is ________.
    A)T/A 1425
    B)T/C 1425
    C)T/D 1426
    D)T/D 1425
    Answer: T/D 1425
  • Q. Who of the following is known for having designed the first railway timetables?
    A)George Bradshaw
    B)George Bradman
    C)George Bernard Shaw
    D)George Brummel
    Answer: George Bradshaw
  • Q. What will be the maximum speed of train passing through loop line of a station name suffixed by “II” in working time table.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. Gateman competency certificate of interlocked traffic gate is signed by TI and SE (Sig) and counter signed by ________.
    A)DOM
    B)AOM(G)
    C)AOM(Chg)
    D)None of these
    Answer: AOM(G)
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. In which year Research, Design and Standard organization was established?
    A)1959
    B)1954
    C)1957
    D)1967
    Answer: 1957
  • Q. At A class station, Neutral zone is the portion between starter and ________ signal.
    A)Home signal
    B)Advance starter
    C)Starter
    D)None of these
    Answer: Advance starter
  • Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Red
  • Q. Section controller is responsible for ________ on a section of a railway provided with the system of speech communication.
    A)Station Traffic
    B)Movement of traffic
    C)None of Traffic
    D)None of these
    Answer: Movement of traffic
  • Q. The speed of Motor Trolly over points and crossings is
    A)15 kmph
    B)10 kmph
    C)8 kmph
    D)None of these
    Answer: 15 kmph
  • Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
    A)Third
    B)First
    C)Second
    D)None of these
    Answer: Second
  • Q. EMU train has ________ and automatic types of working brakes.
    A)Hand Brake
    B)EP Brakes
    C)Power Brake
    D)None of these
    Answer: EP Brakes
  • Q. Hand shunting of vehicles in gradients ________ is totally prohibited
    A)1 In 100 or steeper
    B)1 in 400 or Steeper
    C)1 in 200 or steeper
    D)None of these
    Answer: 1 in 400 or Steeper
  • Q. Accident drill is to be conducted once in ________ if no real accident occurs during this period.
    A)01 month
    B)04 month
    C)02 month
    D)03 Months
    Answer: 02 month
  • Q. Target time for dispatch of ARME from single exit siding at night is ________ minutes.
    A)8
    B)10
    C)5
    D)25
    Answer: 25
  • Q. Which Zone is the largest railway zone in India?
    A)Eastern Railway
    B)Central Railway
    C)Northern Railway
    D)Western Railway
    Answer: Northern Railway
  • Q. During serious accident, ________ will be the in-charge of control office.
    A)Sr. DOM
    B)DOM
    C)AOM
    D)None of these
    Answer: Sr. DOM