More Questions on Indian Railway
- Q. Which aspect of signal on Automatic section while showing “A” & “AG” both light-up?
A)Gate opened and point is not set for main line
B)Gate closed and point is set for main line
C)Gate opened and point is set for main line
D)Defective signal
Answer: Defective signal
- Q. How many Class of Accident?
A)20
B)14
C)16
D)None of these
Answer: 16
- Q. Indian Railways has recently signed pact with which company for use of Natural Gas in railway workshops?
A)NTPC
B)ONGC
C)GAIL India
D)IOCL
Answer: GAIL India
- Q. Sounding of 5 hooters means ________.
A)ART, MRV required at out station
B)ART
C)MRV
D)None of these
Answer: ART, MRV required at out station
- Q. Rake link book-let is prepared by COM and ________.
A)DPO
B)CPTM
C)CPO
D)None of these
Answer: CPTM
- Q. Authority to pass IBS has been issued from station in rear.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. When a goods train is working without brake can the speed is
A)25 kmph by day and 15 kmph by night
B)15 kmph
C)25 kmph
D)None of these
Answer: None of these
- Q. Over which of the following rivers is the world’s highest railway bridge in Kashmir being constructed?
A)Sutlej
B)Chenab
C)Jhelum
D)Indus
Answer: Chenab
- Q. If the driver does not received all right signal from the guard, he must call for is by giving.
A)On long
B)Two sharp whistles
C)One long one short.
D)None of these
Answer: Two sharp whistles
- Q. The Mughalsarai junction has recently renamed as Deen Dayal Upadhyaya railway station. It is located in which state?
A)Uttarakhand
B)Bihar
C)Uttar Pradesh
D)Delhi
Answer: Uttar Pradesh
- Q. Colour of the semaphore repeating signal is ________.
A)Yellow
B)Red
C)White
D)Green
Answer: Yellow
- Q. When an accident occurs the GDR must their report to next SM in form.
A)ACC5
B)ACC1
C)ACC2
D)ACC3
Answer: ACC3
- Q. Maximum speed of trains during thick & foggy weather in automatic block system is ________ kmph when signal is showing double yellow.
A)25
B)30
C)20
D)50
Answer: 30
- Q. How much block overlap is required at the station equipped with single line MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. At what time the first train in Indian (and in Asia) flagged off?
A)Saturday, 03:35 PM
B)Saturday, 8:50 AM
C)Sunday, 10:00 AM
D)Sunday, 02:30 PM
Answer: Saturday, 03:35 PM
- Q. When was the construction work for the first Railway line Started?
A)1823
B)1821
C)1828
D)1830
Answer: 1821
- Q. Guard of passenger train shall sign on ________ minutes before the actual departure of the train.
A)40
B)35
C)30
D)35
Answer: 30
- Q. What is the speed of second train on double line section running on T/A602?
A)10 kmph
B)20 kmph
C)15 kmph
D)8 kmph
Answer: 8 kmph
- Q. Guard’s assistance is required by LP.
A)0
B)0
C)0
D)____
Answer: 0
- Q. In Automatic block system, when a train is working on T/B912, the speed over, points at station is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 15 kmph