More Questions on Indian Railway
- Q. The largest national enterprise of India is
A)Airways
B)Indian Railway
C)Indian Shipyard
D)Waterways
Answer: Indian Railway
- Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
A)45
B)70
C)65
D)75
Answer: 75
- Q. Which Zone is the largest in Indian Railways?
A)Eastern Railway
B)Central Railway
C)Northern Railway
D)Western Railway
Answer: Eastern Railway
- Q. When a Goods train is working without guard or BV or Guard and BV the speed is
A)10
B)25
C)20
D)None of these
Answer: 25
- Q. High flood level mark shall be painted in
A)Blue
B)Red
C)White
D)None of these
Answer: Red
- Q. Block section limit board provided at station?
A)B class Single line TA
B)B class Single line MAUQ
C)B class Double line TA
D)B class Double line MA
Answer: B class Double line MA
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. Speed of second train during temporary single line working is ________.
A)Both
B)Normal
C)Abnormal
D)None of these
Answer: Normal
- Q. When VP vehicles are attached in a goods train the maximum number of VPvehicle in one group is
A)8
B)10
C)6
D)None of these
Answer: 6
- Q. At which of the following places Diesel Component Works is established?
A)Perambur
B)Jamshedpur
C)Patiala
D)Varanasi
Answer: Patiala
- Q. D class station board is placed ________ meters from the end of the platform.
A)600
B)400
C)500
D)800
Answer: 500
- Q. At the starting station, passenger train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 100
- Q. Moped trolley / Scooter trolley treated as ________.
A)Motor Trolley
B)Push Trollies
C)Trolley
D)None of these
Answer: Motor Trolley
- Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
A)Shunt signal
B)Calling-on Signal
C)Home Signal
D)None of these
Answer: Home Signal
- Q. Consider the following statements about the Bio Toilet Project in Indian Railways: 1)The bio – toilets are joint initiative of Indian Railways and DRDO 2)The human excreta in the bio – toilets is treated through anaerobic digestion process 3)The bio toilet reduces the solid human waste to biogas and pure water Which of the above statements is/are correct?
A)2 & 3 Only
B)1 & 3 Only
C)2 Only
D)1, 2 & 3
Answer: 1, 2 & 3
- Q. Consider the following: Road and Railways Schools Sanitary Facilities Hospitals Which among the above are considered to be the Economic Overheads?
A)1, 2 & 3
B)Only 1
C)1 & 2
D)1, 2 , 3 & 4
Answer: Only 1
- Q. In case of defective head light, ________ bell code is given on block instrument to the station in advance.
A)000000-000
B)00000-0
C)000000-0
D)0000-00
Answer: 000000-0
- Q. Shunt signal is a ________ signal.
A)Both
B)Subsidiary
C)Ordinary
D)None of these
Answer: Subsidiary
- Q. The main objective of British developing Indian Railway system was to facilitate the traffic between?
A)Source of raw material and production centers
B)Source of raw material and export centers
C)Source of raw material and ports
D)Source of raw material and markets
Answer: Source of raw material and production centers
- Q. The headquarters of North – East Frontier Railway (NFR) is
A)Chennai
B)Kolkata
C)Maligaon (Guwahati)
D)Gorakhpur
Answer: Maligaon (Guwahati)