More Questions on Indian Railway
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. Trap indicator is provided to indicate ________.
A)Provision Switch
B)Indication Switch
C)Derailing switch
D)None of these
Answer: Derailing switch
- Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC
B)A Class/IBS
C)C Class/IBS
D)None of these
Answer: C Class/IBS
- Q. Loco Pilot shall sound ________ whistle if SM do not exchange hand signals.
A)One short
B)Two short
C)Three short
D)Noen of these
Answer: Two short
- Q. After TFC, all the related authorities are inspected by ________ and its report is sent to DRM within 7 days.
A)LI
B)TI
C)CI
D)None of these
Answer: TI
- Q. Through which of the following group of states does the Konkan Railways run?
A)Maharashtra - Karnataka - Kerala - Tamil Nadu
B)Maharashtra - Karnataka - Andhra Pradesh - Kerala
C)Maharashtra - Karnataka - Goa
D)Karnataka - Goa - Kerala - Tamil Nadu
Answer: Maharashtra - Karnataka - Goa
- Q. Diesel locomotives are built in?
A)Perambur
B)Banglore
C)Varanasi
D)Hubli
Answer: Varanasi
- Q. India’s first solar – powered 1600 HP DEMU train has launched from which railway station?
A)Habibganj railway station
B)Farukhnagar railway station
C)Safdarjung railway station
D)Mumbai Central railway station
Answer: Safdarjung railway station
- Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5
B)10
C)20
D)None of these
Answer: 10
- Q. What is the position of the Indian Railway in the world according to the length of rail lines?
A)Third
B)First
C)Second
D)Fourth
Answer: Fourth
- Q. If distant signal show green accepts, which indication is shown for loco pilot on single distant?
A)Receive on loop line
B)Run through from station
C)Receive of Main line
D)None of these
Answer: Run through from station
- Q. Which of the following stations was formerly known as Victoria Terminus?
A)Lokmanya Tilak Terminus
B)Churchgate Railway Station
C)Mumbai Central
D)Chhatrapati Shivaji Terminus
Answer: Chhatrapati Shivaji Terminus
- Q. It is the responsibility of SM to see that shunting is performed as per ________.
A)G&R
B)WTT
C)SWR
D)None of these
Answer: SWR
- Q. Train is to be passed through loop line.
A)30 kmph
B)15 kmph
C)25 kmph
D)Normal speed
Answer: 15 kmph
- Q. What is maximum width of coaching stock in BG?
A)3250 mm
B)3050 mm
C)3200 mm
D)3300 mm
Answer: 3250 mm
- Q. Under approved special instructions, Distant signal can be placed along with the
A)Both
B)Last Stop
C)First Stop
D)None of these
Answer: Last Stop
- Q. The speed of engine movement from traffic yard to loco and loco to traffic yard is
A)15 kmph
B)8 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. What should be done by guard if train entering in block section without authority to proceed?
A)Protect the Train
B)Stop the Train
C)Inform to SM
D)All of above
Answer: All of above
- Q. To start the train from a line with common starter, ________ authority is issued.
A)T/512
B)T/516
C)T/517
D)T/511
Answer: T/512
- Q. How much time a railway employee associated with train operation can not drink alcohol before coming to his work?
A)6 hours
B)12 hours
C)8 hours
D)2 Hours
Answer: 8 hours