More Questions on Indian Railway
- Q. What will be the speed of second train after single line working introduced on double line sectionduring fogy weather in block section?
A)30 kmph
B)25 kmph
C)60 kmph
D)Normal speed
Answer: 60 kmph
- Q. After train parting when the portion is dispatched ________ is the authority for the driver to go to next station.
A)T/606
B)T/605
C)T/606
D)T/609
Answer: T/609
- Q. Speed of second train during temporary single line working is ________.
A)Both
B)Normal
C)Abnormal
D)None of these
Answer: Normal
- Q. The headquarter of Central Railway situated at?
A)Gwalior
B)Mumbai (CST)
C)Mumbai (Church Gate)
D)Gorakhpur
Answer: Mumbai (CST)
- Q. What is the position of the Indian Railway under the zonal system?
A)Third
B)First
C)Second
D)Forth
Answer: Second
- Q. Block competency certificate is given in the prescribed form ________.
A)T/115A
B)T/115B
C)T/115C
D)T/115D
Answer: T/115B
- Q. While receiving train on an obstructed line and danger signal must be shown to LP at
A)40 meters from obstruction
B)45 meters
C)30 meters
D)None of these
Answer: 45 meters
- Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
A)PWI
B)CI
C)LI
D)TI
Answer: PWI
- Q. Speed of train shall not be more than ________ km/h in case of whistle failure in block section.
A)25
B)20
C)15
D)30
Answer: 25
- Q. What is the speed of a train after normalized in OHE supply immediate after tripping?
A)40/15 kmph
B)60/30 kmph
C)35/20 kmph
D)Normal speed
Answer: 35/20 kmph
- Q. The number of line clear ticket in down direction is ________.
A)T/A 1425
B)T/C 1425
C)T/D 1426
D)T/D 1425
Answer: T/D 1425
- Q. Where is the Indian Railways Institute of Mechanical and Electrical Engineering institute situated?
A)Jamalpur
B)Nasik
C)Baroda
D)Pune
Answer: Jamalpur
- Q. Which Zone is the largest in Indian Railways?
A)Eastern Railway
B)Central Railway
C)Northern Railway
D)Western Railway
Answer: Eastern Railway
- Q. What will be the distance between banner flag and stop indicator if engineering work continue for more than one day ?
A)27 meters
B)30 meters
C)3 meters
D)100 meters
Answer: 30 meters
- Q. The number of Train examination report is ________.
A)T/436
B)T/431
C)T/432
D)T/436
Answer: T/431
- Q. Shatabdi Express train was started in ________.
A)1990
B)1984
C)1988
D)1985
Answer: 1988
- Q. To call the Guard to the driving cab, Motorman of EMU train will give ________ bell code.
A)0
B)0
C)0
D)0
Answer: 0
- Q. Danger zone in 1500 DC traction is ________ meters from OHE.
A)3
B)1
C)2
D)4
Answer: 1
- Q. Maximum speed of shunting of wagons with explosives is ________ km/h.
A)15
B)8
C)10
D)20
Answer: 8
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State