Q. When a front portion of a parted train gives one long one short one long one short whistle, SM to wave ________ signal four times above head from side to side and acknowledge.
A
Yellow
B
RED
C
Green
D
None of these
Correct Answer
RED
More Questions on Indian Railway
Q. Which marker is available in repeating signal?
A)P-Marker B)G-Marker C)C-Marker D)R-Marker
Answer: R-Marker
Q. In which year Indian Railway was nationalized?
A)1952 B)1947 C)1951 D)1955
Answer: 1951
Q. Track maintenance machine is permitted to work during
A)Day clear weather B)Day C)Day and Night D)None of these
Answer: Day and Night
Q. SLB determines the limits of block section and ________.
A)Station Limit B)Block Section C)Station Section D)None of these
Answer: Station Section
Q. Guard of goods train shall sign on ________ minutes before the actual departure of the train.
A)40 B)45 C)30 D)35
Answer: 45
Q. Kacheguda railway station has declared the India’s first Energy – Efficient ‘A1 Category’ Railway Station. It is situated in which city?
A)Kochi B)Hyderabad C)Chennai D)Kolkata
Answer: Hyderabad
Q. There is insufficient vacuum/pressure in engine.
A)_____00 B)___0___ C)0___0 D)00-----
Answer: 00-----
Q. When the rail failure is rectified by the train can pass at speed
A)30 kmph B)20 kmph C)25 kmph D)None of these
Answer: 30 kmph
Q. Point indicator is provided to indicate ________.
A)Both B)Points C)Bar D)None of these
Answer: Points
Q. Consider the following statements about the Railway Convention Committee: 1)It consists of members from Lok Sabha only 2)Chairman of Railway Convention Committee is appointed by Lok Sabha speaker Which among the above statements is/are correct?
A)Both 1 & 2 B)1 Only C)2 Only D)Neither 1 nor 2
Answer: 2 Only
Q. Which authority shall be received from station in rear to pass defective home signal?
A)T-409 B)T-369(3b) C)T-369(1) D)Simple memo
Answer: T-369(1)
Q. Signal passed at danger is treated as ________ accident.
A)Indirection B)Indicative C)Direct D)None of these
Answer: Indicative
Q. On double line, when a running line is blocked by stabled load , the point to be set against are
A)Advance point B)Either side points C)Rear points D)None of these
Answer: Rear points
Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
A)3 B)1 C)2 D)None of these
Answer: 3
Q. Minimum depth of space for wheel flange from rail level in BG is
A)3" B)2" C)1 (1/2)" D)None of these
Answer: 1 (1/2)"
Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal B)First stop signal C)Last Stop signal D)None of these
Answer: Last Stop signal
Q. Which of the following is / are Union Subjects as per seventh schedule of the Constitution of India? 1)Armed Forces 2)Paramilitary Forces 3)Railway Police 4)Cantonment Areas Select the correct option from the codes given below: