Q. When a train is received at a station during signal failure on signal post telephone, the speed of train is

Correct Answer

15 kmph

More Questions on Indian Railway

  • Q. India’s first rail auto hub will be located in:
    A)Delhi
    B)Kolkata
    C)Chennai
    D)New Delhi
    Answer: Chennai
  • Q. Time taken by train running at booked speed is called as ________.
    A)Normal running time
    B)Long time
    C)Minimum running time
    D)None of these
    Answer: Normal running time
  • Q. Max. Speed of passenger train attached with four wheeler wagon shall be ________ km/h.
    A)45
    B)70
    C)65
    D)75
    Answer: 75
  • Q. The senior most ________ officer is personally responsible for ensuring and efficient handing of cranes and removal of wreckage after accident.
    A)C & W
    B)Engineering
    C)Mechanical
    D)None of these
    Answer: Mechanical
  • Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
    A)Yellow
    B)Red
    C)Green
    D)White
    Answer: Red
  • Q. Competency certificate of the gateman of non- interlocked engineering gate is signed by ________.
    A)PWI
    B)CI
    C)LI
    D)TI
    Answer: PWI
  • Q. Which of the following sectors are included as part of multi – modal logistics hubs in India? 1)Aviation 2)National Highways 3) Ports 4)Inland waterways 5)Railways Select the correct option from codes given below:
    A)1, 2, 3, 4 & 5
    B)Only 2, 3 & 4
    C)Only 2, 3, 4, 5
    D)Only 2, 3 & 5
    Answer: 1, 2, 3, 4 & 5
  • Q. Indian railways has installed Asia’s largest Solid State Interlocking (SSI) system in which state?
    A)Madhya Pradesh
    B)Tamil Nadu
    C)West Bengal
    D)Punjab
    Answer: West Bengal
  • Q. The maximum speed of the assistance train to be sent on T/A 602
    A)30 kmph
    B)10 kmph
    C)15 kmph
    D)40 kmph
    Answer: 15 kmph
  • Q. For imposition of line block application must be sent ________ Hours in advance.
    A)18
    B)24
    C)12
    D)22
    Answer: 24
  • Q. For block forwarded form ________ must be issued.
    A)Both
    B)T/806+LSSS
    C)T/608
    D)None of these
    Answer: T/806+LSSS
  • Q. For a passenger carrying train to stop with a few passengers vehicles beyond platform, it must be permitted by
    A)DOM
    B)DSO
    C)DRM
    D)None of these
    Answer: DRM
  • Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
    A)Power
    B)Electrical & Diesel
    C)Diesel
    D)None of these
    Answer: Electrical & Diesel
  • Q. Permission to run C’ class ODC is given by CRS and the maximum speed of train is
    A)4
    B)2
    C)3
    D)6
    Answer: 2
  • Q. All the authorities related to TSL working are examined by TI and its report is submitted to DRM within ________ days of resumption of normal working.
    A)10
    B)7
    C)9
    D)15
    Answer: 7
  • Q. When a train is working on T/D912 in automatic block in system, the train must be piloted into the station during reception by
    A)T/369(1)
    B)T/369(3b)
    C)T/369(2)
    D)T/409
    Answer: T/409
  • Q. Calling on signal shows ________ light in off position in two aspect signalling system.
    A)Green
    B)White
    C)RED
    D)Yellow
    Answer: Yellow
  • Q. The headquarters of South Railways is situated at
    A)Delhi
    B)Kolkata
    C)Chennai
    D)Mumbai
    Answer: Chennai
  • Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
    A)15
    B)25
    C)20
    D)10
    Answer: 25
  • Q. When a driver finds automatic stop signal at on he must stop for 01 minute during day and 02 minutes during night and proceed at ________ kmph
    A)25
    B)15
    C)20
    D)None of these
    Answer: 15

Leave a Comment