Q. Which authority shall be received from station in rear to pass defective home signal?

Correct Answer

T-369(1)

More Questions on Indian Railway

  • Q. In the classification of A to R accidents, ________ and ‘o’ classes are not included.
    A)Both
    B)Minor
    C)Serious
    D)None of these
    Answer: Serious
  • Q. Speed of train when whistle becomes defective is ________ km/h.
    A)45/8
    B)30/8
    C)25/8
    D)40/8
    Answer: 25/8
  • Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
    A)T/104C
    B)T/105B
    C)T/106B
    D)T/102B
    Answer: T/102B
  • Q. Visibility test object is placed at a distance of ________ meters from the station building.
    A)180
    B)108
    C)100M
    D)200
    Answer: 180
  • Q. A separate Railway Budget, which is different from the General Budget, was first introduced in 1924 on the basis of recommendations of the 10 – member:
    A)Rail Budget Committee
    B)Acworth Committee
    C)Srinivas Shastri Committee
    D)Sultan Committee
    Answer: Acworth Committee
  • Q. Block back are used at?
    A)Single/Double line both
    B)On Single line
    C)On Double line
    D)None of these
    Answer: Single/Double line both
  • Q. Station Master shall give line clear with ________ while granting line clear.
    A)Calling-on
    B)Shunt signal
    C)Private No.
    D)None of these
    Answer: Private No.
  • Q. What is shunting order number?
    A)T-806
    B)T-609
    C)T/A-602
    D)T-409
    Answer: T-806
  • Q. No passenger train shall be started from a station before the ________ time
    A)Both
    B)Advertised
    C)Non-advertised
    D)None of these
    Answer: Advertised
  • Q. Signals are normally located to the ________ side of the line.
    A)Both
    B)Right
    C)Left
    D)None of these
    Answer: Left
  • Q. Single line working inforce on double line.
    A)T/D 602
    B)T-511
    C)T-512
    D)Simple memo
    Answer: T/D 602
  • Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
    A)25/10 kmph
    B)15/8 kmph
    C)25/8 kmph
    D)25/12 kmph
    Answer: 25/8 kmph
  • Q. WTT will be issued ________.
    A)Three in Year
    B)Once in a Year
    C)Two in a Year
    D)None of these
    Answer: Once in a Year
  • Q. While passing through the non-interlocked points, maximum speed of the train shall be ________ km/h.
    A)15 km
    B)8 km
    C)10 km
    D)20 km
    Answer: 15 km
  • Q. Maximum number of Explosive unit wagons in a goods
    A)3
    B)10
    C)15
    D)None of these
    Answer: 10
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. Loss of Railway property of ________ is treated as serious accident.
    A)75 Lakhs
    B)More than 50 lakhs
    C)01 crore
    D)More than 02 crore
    Answer: More than 02 crore
  • Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
    A)15
    B)10
    C)5
    D)20
    Answer: 20
  • Q. Block competency certificate is issued by ________.
    A)AOM
    B)Principal ZRTI
    C)SM
    D)None of these
    Answer: Principal ZRTI
  • Q. After proceeding 1200 meters from the obstruction Guard to place ________ detonator 10 meters apart in absolute Block system in BG
    A)3
    B)1
    C)2
    D)None of these
    Answer: 3