More Questions on Indian Railway
- Q. If the signal is continuously bobbing/flickering, the signal is treated as showing ________ aspect.
A)Rectified
B)Most Restrictive
C)Restrictive
D)None of these
Answer: Most Restrictive
- Q. For overhauling of lever frame at stations, ________ is prepared jointly by Sr. DOM and DSTE for working of trains.
A)Both
B)Temporary Working Order.
C)Permanent working order.
D)None of these
Answer: Temporary Working Order.
- Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Red
- Q. The use of block instrument shall be governed by special instructions to be issued with the prior approval of
A)CSO
B)Railway Board
C)CRS
D)None of these
Answer: CRS
- Q. The shuttle train service between Lahore and ________ railway station resumed its operation on 15 December after a gap of 22 years.
A)Amritsar
B)Wagah
C)Islamabad
D)Faridkot
Answer: Wagah
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. Calling on signal is a ________ signal.
A)Subsidiary
B)Permissive
C)Home
D)None of these
Answer: Subsidiary
- Q. When the derailing switch is closed, trap indicator shows ________ Light by night and no target by day.
A)Yellow
B)Red
C)Green
D)White
Answer: Green
- Q. Which type Authority to proceed shall be used at without starter signal station on single line?
A)Any one
B)Non Tangible
C)Tangible
D)None of these
Answer: Tangible
- Q. There is insufficient vacuum/pressure in engine.
A)_____00
B)___0___
C)0___0
D)00-----
Answer: 00-----
- Q. High flood level mark shall be painted in
A)Blue
B)Red
C)White
D)None of these
Answer: Red
- Q. The headquarters of North – Eastern railway is situated at
A)Gorakhpur
B)Mumbai (CST)
C)Guwahati
D)New Delhi
Answer: Gorakhpur
- Q. How many systems of working in Indian Railways for train operation?
A)8
B)6
C)7
D)9
Answer: 6
- Q. Shunting to be done in D/L block section
A)T-806
B)PLCT
C)T-369(3b)
D)Simple memo
Answer: T-806
- Q. Which app has been launched by the Ministry of Railways to expedite & streamline passenger grievance redressal?
A)Rail Madad
B)Rail Sathi
C)Rail Dost
D)Rail Neer
Answer: Rail Madad
- Q. Permissible limit of flat tyre in goods and coaching vehicles is 60mm and ________ respectively.
A)80 mm
B)60 mm
C)70 mm
D)50 mm
Answer: 50 mm
- Q. If the Loco Pilot stops after passing the home siGnal and sounds long short long short whistle, it means ________.
A)Received train
B)Train Divided
C)Thorugh train
D)None of these
Answer: Train Divided
- Q. Capacity of a slip siding is ________
A)06 or 07 wagon
B)03 or 04 wagon
C)04 or 05 wagon
D)None of these
Answer: 03 or 04 wagon
- Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
A)5
B)4
C)2
D)8
Answer: 5
- Q. What is the maximum speed of a train while view is obstructed due to thick and foggy weather?
A)30 kmph
B)Normal speed
C)15 kmph
D)60 kmph
Answer: 60 kmph