- Q. Marshalling rules of passenger train are framed by ________.
A)DRM
B)DOM
C)COM
D)AOM
Answer: COM
- Q. Where is the Research, Design and Standard Organization situated?
A)Pune
B)Lucknow
C)Bangalore
D)New Delhi
Answer: Lucknow
- Q. If the driver does not receive all right signal from the guard, he must call by giving.
A)On long
B)Two sharp whistles
C)One long one short
D)None of these
Answer: Two sharp whistles
- Q. The form number of authority to proceed without line clear is ________.
A)T/B1408
B)T/1408
C)T/A1408
D)None of these
Answer: T/1408
- Q. Besides Mahrashtra, Karnataka and Goa, which of the following is the fourth State for Konkan Railway Project?
A)Gujarat
B)Kerala
C)Tamil Nadu
D)Andhra Pradesh
Answer: Kerala
- Q. Calling on signal shows ________ light in off position in two aspect signalling system.
A)Green
B)White
C)RED
D)Yellow
Answer: Yellow
- Q. Booked speed of a train is ________ percent less than maximum permissible speed
A)15
B)5
C)10
D)20
Answer: 10
- Q. Second train during all communication failure shall be dispatched after an interval of
A)35
B)20
C)25
D)30
Answer: 30
- Q. Train is to be passed through loop line.
A)30 kmph
B)15 kmph
C)25 kmph
D)Normal speed
Answer: 15 kmph
- Q. The headquarters of South Railways is situated at
A)Delhi
B)Kolkata
C)Chennai
D)Mumbai
Answer: Chennai
- Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912
B)TA-912
C)TB-912
D)TC-1425
Answer: TA-912
- Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)4
B)10
C)9
D)3
Answer: 10
- Q. Interchange point of Central and Western railway is ________.
A)Both
B)Dadar
C)Jalgaon
D)None of these
Answer: Both
- Q. Visibility test object is placed at a distance of ________ meters from the station building.
A)180
B)108
C)100M
D)200
Answer: 180
- Q. During failure of signals and communications in DL automatic area the authority to proceed is
A)T/B 912
B)T/D 912
C)T/A 912
D)None of these
Answer: T/B 912
- Q. Train crew shall exchange alright hand signals upto ________ or last points.
A)Call-on
B)Advance starter
C)Starter
D)None of these
Answer: Advance starter
- Q. The headquarters of Northern Railway is at
A)Gorakhpur
B)New Delhi
C)Guwahati
D)Mumbai (CST)
Answer: New Delhi
- Q. No passenger train shall be started from a station before the ________ time
A)Both
B)Advertised
C)Non-advertised
D)None of these
Answer: Advertised
- Q. Block overlap in two aspect signalling system is ________ meters.
A)400
B)500
C)600
D)600
Answer: 400
- Q. Isolation shall be provided at an interlocked station when the speed is
A)Above 50 kmph
B)50 kmph
C)75 kmph
D)None of these
Answer: Above 50 kmph