More Questions on Indian Railway
- Q. Reminder Caution Order is?
A)T/B409
B)T/409
C)T/A409
D)None of these
Answer: T/B409
- Q. Indian Railway Act means ________.
A)Part 23 of 1989
B)Part 22 of 1989
C)Part 24 of 1989
D)Part 21 of 1989
Answer: Part 24 of 1989
- Q. Consider the following statements about the Railwire Saathi project: 1)It is an initiative by the Indian Railway Stations Development Corporation Limited (IRSDC) 2)It aims to provide railway stations in India with high – speed public Wi – Fi service Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: 2 Only
- Q. How much block overlap is required at the station equipped with MACLS?
A)120 meters
B)400 meters
C)180 meters
D)Zero meters
Answer: 180 meters
- Q. Which of the following stations has all the three gauges viz. broad, metre and narrow?
A)Shimla
B)Lucknow
C)Chandigarh
D)Siliguri
Answer: Siliguri
- Q. SCOR maintains ________ register when serious accident occurs.
A)Chronological
B)Logical
C)Un-logical
D)None of these
Answer: Chronological
- Q. In the event of an accident falling in more than one class it should be treated as an accident in the ________ class.
A)Both
B)Lowest
C)Highest
D)None of these
Answer: Highest
- Q. Where there is no TSR, station master shall make entries in ________.
A)Mid section
B)Station diary
C)Diary
D)None of these
Answer: Station diary
- Q. When the derailing switch is open, trap indicator shows red target by day and ________ Light by night.
A)Yellow
B)Red
C)Green
D)White
Answer: Red
- Q. Calling on signal is placed below any stop signal except ________.
A)Stop Signal
B)First stop signal
C)Last Stop signal
D)None of these
Answer: Last Stop signal
- Q. The monies in the National Investment Fund can be used for ________: 1. Recapitalization of public sector banks 2. Purchasing the shares of CPSEs 3. Towards operating expenses of Indian Railways 4. Social Overheads such as building schools, toilets etc. Select the correct option from the codes given below:
A)Only 1, 2 & 4
B)Only 1, 2 & 3
C)Only 2, 3 & 4
D)Only 1 & 2
Answer: Only 1 & 2
- Q. Loco and traffic running staff are entitled for ________ hours rest at head quarters after running duty of 08 hours or more
A)12 hours
B)04 hours
C)08 hours
D)16 hours
Answer: 16 hours
- Q. What is the maximum speed of a train Ist train dispatched after introduced TSL on double line section?
A)15 kmph
B)30 kmph
C)25 kmph
D)Normal speed
Answer: 25 kmph
- Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. Your train is first during TSL on double line.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 25 kmph
- Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC
B)A Class/IBS
C)C Class/IBS
D)None of these
Answer: C Class/IBS
- Q. Whistle boards must be provided at an adequate distance in rear of all level crossing gates on both side?
A)600 meters
B)400 meters
C)500 meters
D)800 meters
Answer: 600 meters
- Q. Height gauge is for the safety of ________.
A)Motor Trolley
B)Trolley
C)Ohe
D)None of these
Answer: Ohe
- Q. When the Loco pilot should contact with SM on telephone while IBS in “ON” position?
A)Immediate
B)After 5 minutes
C)After 2 minutes
D)After 1 miutes in day and 2 minutes in night
Answer: After 1 miutes in day and 2 minutes in night
- Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
A)Authority
B)Private Number
C)Cuation Number
D)None of these
Answer: Private Number
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State