More Questions on Indian Railway
- Q. What will be the speed of goods train without brake van while passing station if tail lamp is not provided?
A)Normal
B)20 kmph
C)50 kmph
D)Stop at every station
Answer: 20 kmph
- Q. Flasher light is of ________ colour.
A)Green
B)Red
C)Amber
D)None of these
Answer: Amber
- Q. In case of goods train without brake van, Guard is exempted from ________.
A)Whistling
B)ARS
C)Tail Lamp
D)None of these
Answer: ARS
- Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
A)100 meters
B)45 meters
C)50 meters
D)1000 meters
Answer: 45 meters
- Q. In case of train parting ________ bell code is given on block instrument.
A)000000-000
B)00000-0
C)000000-0
D)0000-00
Answer: 000000-000
- Q. Number of train signal register of single line is ________.
A)T/166 B
B)T/136 A
C)T/137 B
D)T/135
Answer: T/137 B
- Q. In automatic block system SL, the signal that can be dispensed with is
A)Automatic Stop signal
B)Home
C)Starter
D)None of these
Answer: Automatic Stop signal
- Q. If the passenger train is not arrived ________ minutes beyond its normal running time, it is treated as delayed train.
A)4
B)10
C)9
D)3
Answer: 10
- Q. TSL is started between those two stations at which cross over facility are available and
A)D Class/IBC
B)A Class/IBS
C)C Class/IBS
D)None of these
Answer: C Class/IBS
- Q. When a trolley is working on T/1518 during thick or foggy weather, the speed is
A)10 kmph
B)5 kmph
C)8 kmph
D)None of these
Answer: 5 kmph
- Q. If the patrol man does not turn up within ________ minutes, caution order must be issued.
A)15
B)10
C)5
D)20
Answer: 20
- Q. Maximum impact speed when shunting a group of roller bearing fitted stock coupled together must be?
A)3 kmph
B)2 kmph
C)2.5 kmph
D)3.5 kmph
Answer: 2.5 kmph
- Q. In which city is the Wheel and Axle Plant of the Indian Railways located?
A)Bangalore
B)Kapurthala
C)Varanasi
D)Rae Barelly
Answer: Bangalore
- Q. What should be done by guard if train entering in block section without authority to proceed?
A)Protect the Train
B)Stop the Train
C)Inform to SM
D)All of above
Answer: All of above
- Q. In context with the Indian railways what is TPWS?
A)Train Protection Warning Stopper
B)Train Passenger Warning System
C)Train Protection Warning System
D)Transmission Protection warning Stopper
Answer: Train Protection Warning System
- Q. What will be the maximum speedof train in case of failure of headlight of engine?
A)60 kmph
B)30 kmph
C)40 kmph
D)Normal speed
Answer: 40 kmph
- Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912
B)TA-912
C)TB-912
D)TC-1425
Answer: TA-912
- Q. Goods train without brake van shall not be run during ________.
A)CCF
B)BCF
C)ACF
D)None of these
Answer: ACF
- Q. A vehicle which can be bodily lifted off the line by ________ is a trolley
A)3 man
B)02 man
C)04 man
D)None of these
Answer: 04 man
- Q. Which of the following is the largest railway junction in India?
A)Mathura
B)Delhi
C)Bhatinda
D)Allahabad
Answer: E