Q. Load infringing standard moving dimensions (ISMD) shall be moved by

Correct Answer

Through train

More Questions on Indian Railway

  • Q. Which of the following is / are eligible to receive Ways and Means Advances from RBI to handle their temporary mismatch in the cash flow? 1)State Governments 2)Central Government 3)Public Sector Companies 4)Indian Railways Select the correct option from the codes given below:
    A)Only 1 & 3
    B)Only 1
    C)Only 1 & 2
    D)Only 1, 3 & 4
    Answer: Only 1
  • Q. Medical relief van shall be dispatched within ________ minutes from double exit siding.
    A)15
    B)10
    C)20
    D)25
    Answer: 15
  • Q. SLB determines the limits of block section and ________.
    A)Station Limit
    B)Block Section
    C)Station Section
    D)None of these
    Answer: Station Section
  • Q. Mission PACE deals with
    A)Fast Ticketing System
    B)Protection of nature
    C)Help Customers
    D)Quality of Goods and Services
    Answer: Quality of Goods and Services
  • Q. When the rail failure is rectified by the train can pass at speed
    A)30 kmph
    B)20 kmph
    C)25 kmph
    D)None of these
    Answer: 30 kmph
  • Q. Where is the wheel and axle plant of Indian Railways situated?
    A)Bangalore
    B)Chittranjan
    C)Kapurthala
    D)Perambur
    Answer: Bangalore
  • Q. DRM nominates ________ for each section to issue caution orders to train crew.
    A)Nil notice
    B)Caution notice station
    C)Notice
    D)None of these
    Answer: Caution notice station
  • Q. Signal overlap at a terminal station with multi aspect colour light signalling is ________.
    A)Green
    B)White
    C)Red
    D)NIL
    Answer: NIL
  • Q. The turning out time of an MRV Spl. When in is kept in one exit siding is ________ minutes.
    A)20
    B)25
    C)15
    D)None of these
    Answer: 25
  • Q. Upto how many track machine shall be allowed for working within the block section?
    A)8
    B)2
    C)5
    D)10
    Answer: 5
  • Q. Traffic gates are those located between ________.
    A)First signal
    B)Outermost stop signal
    C)Stop signal
    D)None of these
    Answer: Outermost stop signal
  • Q. Block overlap in two aspect signalling system is ________ meters.
    A)400
    B)500
    C)600
    D)600
    Answer: 400
  • Q. Last stop signal means the ________ of a station controlling the entry of trains into the next block section.
    A)Call-on Signal
    B)Fixed stop signal
    C)Hand Signal
    D)None of these
    Answer: Fixed stop signal
  • Q. ndian Railway’s Jamalpur Workshop is located at?
    A)Bihar
    B)West Bengal
    C)Orissa
    D)Uttar Pradesh
    Answer: Bihar
  • Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
    A)Stop his train and find the cause
    B)Proceed further with same speed up to next station
    C)Proceed further with normal speed
    D)None of these
    Answer: Stop his train and find the cause
  • Q. Motor coach is a ________ coach.
    A)Self Minor
    B)Self Propelled
    C)Self System
    D)None of these
    Answer: Self Propelled
  • Q. At the starting station, 40 BCN air braked train must have ________ kg/cm2 of BP pressure in the engine.
    A)5
    B)4
    C)2
    D)8
    Answer: 5
  • Q. In case of train parting ________ bell code is given on block instrument.
    A)000000-000
    B)00000-0
    C)000000-0
    D)0000-00
    Answer: 000000-000
  • Q. How much block overlap is required at the station equipped with MACLS?
    A)120 meters
    B)400 meters
    C)180 meters
    D)Zero meters
    Answer: 180 meters
  • Q. Normally material train will work during ________.
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day