- Q. The minimum distance from centre to centre of track in BG is
A)13 feet
B)14 feet
C)12 feet
D)None of these
Answer: 14 feet
- Q. If a staff is absent for ________ days from duty fresh declaration must be obtained
A)20 days
B)10 days
C)15 days
D)None of these
Answer: 15 days
- Q. SM shall inspect the personal store of Guard once in ________ months.
A)6
B)2
C)4
D)3
Answer: 3
- Q. During hand shunting only ________ Bogies can be hand shunted.
A)3
B)1
C)2
D)None of these
Answer: 1
- Q. Railway Staff College is situated at
A)Chennai
B)Bangalore
C)Secunderabad
D)Vadodara
Answer: Vadodara
- Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
A)5
B)10
C)20
D)None of these
Answer: 10
- Q. The speed of cycle/moped trolley is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. BD special shall be turned out during night within
A)30 meters
B)25 meters
C)45 meters
D)None of these
Answer: 45 meters
- Q. Wagon with livestock shall be attached ________ position from engine on a passenger train.
A)Third
B)First
C)Second
D)None of these
Answer: Second
- Q. To send the assisting engine into obstructed block section T/A 602 authority is issued ________ and the speed of engine shall be ________.
A)15/10 km/h
B)25/10 km/h
C)20/10 km/h
D)None of these
Answer: 15/10 km/h
- Q. Caution indication board will be provided at ________ meters from the bridge or vulnerable places.
A)600
B)500
C)400
D)800
Answer: 600
- Q. Water over track is 90 mm.
A)15 kmph
B)8 kmph
C)10 kmph
D)25 kmph
Answer: 10 kmph
- Q. In case of 1 in 100 rising gradient, ________ siding is provided.
A)Slip
B)Long
C)Catch
D)None of these
Answer: Slip
- Q. ________ is measured with the help of anemometer.
A)Both
B)Wind
C)Velocity
D)None of these
Answer: Both
- Q. When was the new Harbour rail line inaugurated?
A)1931
B)1925
C)1928
D)1933
Answer: 1925
- Q. The turning out time off BD SPL. During day is ________ minutes
A)50
B)30
C)20
D)None of these
Answer: 30
- Q. In automatic areas when all signals have failed and communication is available, the driver is issued ________ as authority to proceed.
A)T/C-912
B)T/B-912
C)T/D-912
D)None of these
Answer: T/D-912
- Q. At least how far will the final detonator be used to defend the train in broad gauge?
A)820 meters
B)180 meters
C)600 meters
D)1220 meters
Answer: 1220 meters
- Q. The numbers of A, B and C coaches are 72, ________ and 76.
A)71
B)72
C)70
D)75
Answer: 70
- Q. In Automatic areas when there are no signals and communication, the speed of the train is ________ kmph while working on T/B 912 during day.
A)15
B)25
C)20
D)10
Answer: 25