Q. ________ must be issued during thick or foggy weather.

Correct Answer

Caution Order

More Questions on Indian Railway

  • Q. When was the North – Eastern frontier Railway (NEFR) established?
    A)2nd Jan, 1956
    B)15th Jan, 1958
    C)15th Jan, 1955
    D)14th April, 1952
    Answer: 15th Jan, 1958
  • Q. Colour of the semaphore shunt signal is ________.
    A)Green
    B)Red
    C)Yellow
    D)None of these
    Answer: Red
  • Q. Palace on Wheels train was inaugurated in which year?
    A)1982
    B)1988
    C)1972
    D)1965
    Answer: 1982
  • Q. Maximum No. of ________ explosive wagons can be attached to a goods train.
    A)6
    B)5
    C)4
    D)10
    Answer: 5
  • Q. When signal is not visible from minimum sighting distance, ________ signal is provided.
    A)Shunt
    B)Repeating
    C)Call-on
    D)None of these
    Answer: Repeating
  • Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
    A)SOR
    B)SWR
    C)WTT
    D)None of these
    Answer: WTT
  • Q. Whenever new signal is put into use, signal sighting committee submits its joint report on
    A)T/104C
    B)T/105B
    C)T/106B
    D)T/102B
    Answer: T/102B
  • Q. On which authority relief train shall be dispatched for obstructed block section?
    A)On memo
    B)PLCT
    C)T/A602
    D)None of these
    Answer: T/A602
  • Q. When a portion of a train is left in a block section, ________ Must be shown on the front vehicle of the rear portion of the train during night.
    A)Both
    B)Red Light
    C)Green Light
    D)None of these
    Answer: Red Light
  • Q. Yearly goods stock census is taken on ________.
    A)30st November
    B)31st December
    C)31st October
    D)31st March
    Answer: 30st November
  • Q. A lorry shall be protected by banner flags and detonators if it remains stationary within the station yard for more than
    A)20 meters
    B)15 meters
    C)10 meters
    D)None of these
    Answer: 15 meters
  • Q. While pushing back, train shall be stopped at ________ stop signal.
    A)Slip
    B)Outermost
    C)Rear most
    D)None of these
    Answer: Outermost
  • Q. General Manager is responsible for
    A)Both railway Board and Railway Ministry
    B)Railway Board
    C)Railway Ministry
    D)Finance Ministry
    Answer: Railway Board
  • Q. The White light in point indicator indicates?
    A)Pass run through
    B)Loop line is set
    C)Main line set
    D)All is right
    Answer: Main line set
  • Q. Interchange point of Central and Western railway is ________.
    A)Both
    B)Dadar
    C)Jalgaon
    D)None of these
    Answer: Both
  • Q. Calling on signal shows ________ light in off position in two aspect signalling system.
    A)Green
    B)White
    C)RED
    D)Yellow
    Answer: Yellow
  • Q. Maximum speed of trains during thick & foggy weather in absolute block system is ________ when signal is showing green.
    A)50
    B)50
    C)40
    D)60
    Answer: 60
  • Q. During total interruption of communication on SL , the speed of LE to establish communication during night is ________ kmph
    A)5
    B)10
    C)20
    D)None of these
    Answer: 10
  • Q. ISMD must be attached always
    A)In the middle
    B)Next to Engine
    C)In rear
    D)None of these
    Answer: Next to Engine
  • Q. Caution order is carried forward at stations on ________ at 09:00 hours.
    A)Monday
    B)Tueday
    C)Sunday
    D)None of these
    Answer: Monday