- Q. When a crane is attached to a goods train with jib trailing the speed in BG is ________.
A)25 kmph
B)50 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. Consider the following statements about Operating Ratio in Indian Railways: 1)The higher the operating ratio of Indian Railways the better is the condition of Indian Railways. 2)Operating ratio of Indian Railways is high on account of social service obligation imposed in Budget. Which of the above statements is/are correct?
A)Both 1 & 2
B)1 Only
C)2 Only
D)Neither 1 nor 2
Answer: 2 Only
- Q. Engineering allowance, loco gain and traffic gain are mentioned in the ________.
A)SOR
B)SWR
C)WTT
D)None of these
Answer: WTT
- Q. On DL in ________ minutes gap trains must be started during total interruption of communication.
A)30
B)20
C)10
D)None of these
Answer: 30
- Q. Clocks of control office shall be synchronized with All India Radio at 08:00 hours,
A)15:30
B)14:30
C)12:30
D)13:30
Answer: 13:30
- Q. If leakage in LPG Tank, how long area is prohibited to carry to burn the burning fire ?
A)100 meters
B)45 meters
C)50 meters
D)1000 meters
Answer: 45 meters
- Q. How many systems of working in Indian Railways for train operation?
A)8
B)6
C)7
D)9
Answer: 6
- Q. Station in rear issues for passing Approach stop signal at ON
A)T-369(1)
B)T-509
C)T-369(3b)
D)Simple memo
Answer: T-369(1)
- Q. On which time the watch shall be set by loco pilot with Station masters watch?
A)A & B both
B)At 8.00 Hrs
C)At 16.00 Hrs
D)At the time of on duty
Answer: At the time of on duty
- Q. Termination indication boards post will be pointed alternatively black and white with ________ CM high bands.
A)15
B)20
C)25
D)30
Answer: 30
- Q. Target time for dispatch of ARME from single exit siding at night is ________ minutes.
A)8
B)10
C)5
D)25
Answer: 25
- Q. With reference to headquarters of the various Railway zones, consider the following matches: North Eastern → Guwahati Central → Bhopal Western → Mumbai Which of the above is / are correct matches:
A)Only 2 & 3
B)Only 1
C)Only 1 & 2
D)Only 3
Answer: Only 3
- Q. During shunting of a passenger train the train engine will be stopped ________ mtrs before attaching to load?
A)10 meters
B)20 meters
C)15 meters
D)5 meters
Answer: 20 meters
- Q. Speed of following tower wagon in the block section is ________ km/h.
A)8
B)5
C)2
D)4
Answer: 8
- Q. A material train may be divided outside station limit during emergency under the supervision of ________.
A)Driver
B)Guard
C)PWI
D)None of these
Answer: PWI
- Q. On which of the following is the longest railway bridge in India located?
A)River Brahmaputra
B)River Ganges
C)Vembanad Lake
D)Chilka Lake
Answer: River Brahmaputra
- Q. In automatic and ghat sections, additional road learning for ________ trips may be demanded by the loco pilot.
A)3
B)1
C)2
D)4
Answer: 3
- Q. Water over track is 90 mm.
A)15 kmph
B)8 kmph
C)10 kmph
D)25 kmph
Answer: 10 kmph
- Q. Guard’s assistance is required by LP.
A)0
B)0
C)0
D)____
Answer: 0
- Q. There are 8 appendices and ________ parts in SWR.
A)10
B)8
C)4
D)12
Answer: 12