More Questions on Indian Railway
- Q. When the Head light fails during night the speed of train is ________ in BG. If there is no other caution for less speed is the Block section
A)25 kmph
B)30 kmph
C)40 kmph
D)None of these
Answer: 40 kmph
- Q. If the points are set for main line, point indicator gives ________ light in the night.
A)Yellow
B)red
C)Green
D)White
Answer: White
- Q. In block section trains entered simultaneously from either direction and finally stopped before collision and distance between both the trains was 400 mtrs, which type of accident occured?
A)Save collision
B)Violation of block rules
C)Passingn danger signal
D)All of above
Answer: All of above
- Q. During TFC in single line section what authority to proceed will be served to driver of Dn train during return.
A)TH-602
B)T/A-602
C)TG-602
D)TB-602
Answer: TH-602
- Q. The speed of cycle/moped trolley is
A)20 kmph
B)15 kmph
C)10 kmph
D)None of these
Answer: 10 kmph
- Q. BSLB determines the limits of block section and ________ .
A)Station Limit
B)Block Section
C)Station Section
D)None of these
Answer: Station Section
- Q. Maximum of ________ cranes can be attached in a passenger train.
A)3
B)1
C)2
D)4
Answer: 1
- Q. Written authority received to pass approach stop signal.
A)25 kmph
B)10 kmph
C)15 kmph
D)Normal speed
Answer: 15 kmph
- Q. It is the responsibility of SM to see that shunting is performed as per ________.
A)G&R
B)WTT
C)SWR
D)None of these
Answer: SWR
- Q. Adequate distance mentioned in the automatic block system is ________ meters.
A)105
B)110
C)120
D)115
Answer: 120
- Q. The consumption of fuel during idle run per hour is
A)25 Lts
B)15 Lts
C)20 Lts
D)None of these
Answer: 25 Lts
- Q. What action shall be taken by loco pilot if Guard failed to exchange all right signal after passing engineering speed restriction zone?
A)Stop his train and find the cause
B)Proceed further with same speed up to next station
C)Proceed further with normal speed
D)None of these
Answer: Stop his train and find the cause
- Q. Adequate distance kept beyond the starter signal to take off the home signal is called as ________.
A)Block instrument
B)Signal over lap
C)Over lap
D)None of these
Answer: Signal over lap
- Q. Fly shunting will take place in
A)Flat Yard
B)Hump Yard
C)Gravity Yard
D)None of these
Answer: Hump Yard
- Q. Caution and Termination indication Boards will be fixed from the bridge or vulnerable places at
A)1000 meters
B)400 meters
C)600 meters
D)None of these
Answer: 600 meters
- Q. When the train catches fire, that carriage must be ________.
A)Both
B)Isolated
C)Non-isolated
D)None of these
Answer: Isolated
- Q. Cancellation facility through ________ helpline number will be provided using ‘One Time Password’ sent on registered phone number.
A)139
B)144
C)123
D)119
Answer: 139
- Q. Maximum speed of pushing back is ________ km/h.
A)45
B)30
C)25
D)40
Answer: 25
- Q. In automatic section, temporary single line working on double line section what authority to proceed will be served to loco pilot from opposite direction?
A)TD-912
B)TA-912
C)TB-912
D)TC-1425
Answer: TA-912
- Q. Shutting signal in the color light signal system under the starter of which light is visible in the on-condition?
A)Single white
B)Yellow
C)Two White parallel
D)No light
Answer: No light
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State