More Questions on Indian Railway
- Q. During total failure of communication on a single line system, asking line clear of 4 trains at a time what will be the speed of next train?
A)25/10 kmph
B)15/8 kmph
C)25/8 kmph
D)25/12 kmph
Answer: 25/8 kmph
- Q. Maximum speed of the train while unloading ballast is ________ km/h.
A)6
B)8
C)4
D)10
Answer: 8
- Q. When unsafe condition of river bund is reported. CO to be issued for speed for day is
A)20 kmph
B)10 kmph
C)15 kmph
D)None of these
Answer: 15 kmph
- Q. Guard shall use ________ bell code to warn the motorman, if motorman violated the speed.
A)0-00-00
B)000-000
C)00-00
D)000-000-000
Answer: 000-000
- Q. Which whistle code shall be used by loco pilot while Approach on W board.
A)Three short
B)Long continue
C)Intermittent
D)Three long
Answer: Intermittent
- Q. Which of the following is the headquarters of the newly established railway zone ‘East Coast Railways’?
A)Hyderabad
B)Visakhapatnam
C)Kolkata
D)Bhubaneswar
Answer: Bhubaneswar
- Q. Motor vehicle in closed wagon shall be attached ________ position from engine on a goods train.
A)Third
B)First
C)Second
D)None of these
Answer: Third
- Q. The first Shatabdi express was introduced between which of the following locations?
A)New Delhi and Jhansi
B)Bombay and Thane
C)Bombay and Kolkata
D)New Delhi and Chennai
Answer: New Delhi and Jhansi
- Q. Tower wagon shall run as per the rules of working of ________.
A)Passengers
B)Wagon
C)Train
D)None of these
Answer: Train
- Q. In Material train, vehicles shall not be detached on gradient.
A)1-400
B)ST 1-260
C)1-100 or steeper
D)None of these
Answer: 1-100 or steeper
- Q. Flasher lights will be provided in all ________ engines working on DL and Automatic areas.
A)Power
B)Electrical & Diesel
C)Diesel
D)None of these
Answer: Electrical & Diesel
- Q. Trolley caution order no is ________.
A)600
B)400
C)500
D)800
Answer: 400
- Q. After getting T/369(I) speed over the points while passing the signal is ________ km/h.
A)25
B)75
C)15
D)30
Answer: 15
- Q. Consider the following: Road and Railways Schools Sanitary Facilities Hospitals Which among the above are considered to be the Economic Overheads?
A)1, 2 & 3
B)Only 1
C)1 & 2
D)1, 2 , 3 & 4
Answer: Only 1
- Q. How much minimum BP pressure is reduce to require to apply brake in a goods train?
A)1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
B)Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
C)1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
D)
Answer: Less than1.0 kg/cm2 B. 1.00 kg/cm2 to 2.00 kg/cm2 C. 1.00 kg/cm2 to 1.50 kg/cm2 D. 2.00 kg/cm2or more
- Q. In case of defective home signal of C’ class station, T/369(3b) authority is issued on which ________ of the staion in advance is written.
A)Authority
B)Private Number
C)Cuation Number
D)None of these
Answer: Private Number
- Q. During shunting if load move toward the person signalling hand signal should be given at night by railway staff.
A)White light left and right
B)Green light up and down
C)Green light left and right
D)Green light without any movement
Answer: Green light left and right
- Q. Distance between two automatic signals is called as ________.
A)Signalling Section
B)Block section
C)Mid Section
D)None of these
Answer: Signalling Section
- Q. When the train catches fire, that carriage must be ________.
A)Both
B)Isolated
C)Non-isolated
D)None of these
Answer: Isolated
- Q. In the enroute, M/E train must have ________ % of brake power.
A)90
B)75
C)50
D)100
Answer: 90
- Geography
- History
- Indian Culture
- Indian Economy
- Indian Politics
- Indian Railway
- Sports
- State