Q. Signal has extinguished.

Correct Answer

------00

More Questions on Indian Railway

  • Q. What will be the minimum distance of 2 Towar Wagons in the same block section ?
    A)130 meters
    B)100 meters
    C)120 meters
    D)140 meters
    Answer: 120 meters
  • Q. During thick & foggy weather, line must be clear upto ________ for granting line clear at a B’ class station in TALQ signalling system on Double line.
    A)Shunt signal
    B)Calling-on Signal
    C)Home Signal
    D)None of these
    Answer: Home Signal
  • Q. Normally material train will work during ________.
    A)Both
    B)Day
    C)Night
    D)None of these
    Answer: Day
  • Q. Which authority shall be issued to pass a starter signal during advanced starter single is failed and starter is interlocked with Ad. Starter at a station equipped with single line token less block?
    A)Memo + Hand Signal
    B)T-369(3b)
    C)PLCT
    D)Starter should be taken off
    Answer: T-369(3b)
  • Q. Approved special instructions are issued by ________.
    A)PCOM
    B)CRS
    C)MT
    D)None of these
    Answer: CRS
  • Q. At least how far will the final detonator be used to defend the train in broad gauge?
    A)820 meters
    B)180 meters
    C)600 meters
    D)1220 meters
    Answer: 1220 meters
  • Q. Slip siding protects
    A)Station section
    B)Station limit
    C)Block section
    D)None of these
    Answer: Block section
  • Q. Which of the following stations was formerly known as Victoria Terminus?
    A)Lokmanya Tilak Terminus
    B)Churchgate Railway Station
    C)Mumbai Central
    D)Chhatrapati Shivaji Terminus
    Answer: Chhatrapati Shivaji Terminus
  • Q. Continuity test is to be done.
    A)_____00
    B)0
    C)0
    D)00------
    Answer: 00------
  • Q. Upto how many track machine shall be allowed for working within the block section?
    A)8
    B)2
    C)5
    D)10
    Answer: 5
  • Q. Trap indicator is provided to indicate ________.
    A)Provision Switch
    B)Indication Switch
    C)Derailing switch
    D)None of these
    Answer: Derailing switch
  • Q. Validity of the competency certificate of the gateman is for ________ years.
    A)9
    B)10
    C)3
    D)4
    Answer: 3
  • Q. The Mughalsarai junction has recently renamed as Deen Dayal Upadhyaya railway station. It is located in which state?
    A)Uttarakhand
    B)Bihar
    C)Uttar Pradesh
    D)Delhi
    Answer: Uttar Pradesh
  • Q. Consider the following railway zones with their headquarters: West Central Railway→ Jabalpur East Coast Railway → Bhubaneswar Western Railway→ Mumbai Which of the above is / are correct?
    A)1, 2 & 3
    B)1 & 2 Only
    C)2 & 3 Only
    D)None
    Answer: 1, 2 & 3
  • Q. Authority to pass IBS has been issued from station in rear.
    A)25 kmph
    B)10 kmph
    C)15 kmph
    D)Normal speed
    Answer: 15 kmph
  • Q. In recent times, the “dynamic brake system” is becoming popular in modern railways. The dynamic brake system coverts Kinetic energy to________:
    A)Sound energy
    B)Potential energy
    C)Electricity
    D)Magnetic energy
    Answer: Electricity
  • Q. By whom the rear portion of train left behind in block section protected?
    A)By engineearing official
    B)By Guard
    C)By LP
    D)No need to protect the load
    Answer: By Guard
  • Q. Which of the following is India’s first green railway corridor?
    A)Chennai to Manamadurai
    B)Barmer to Munawab
    C)Manamadurai to Rameswaram
    D)Puri to Visakhapatnam
    Answer: Manamadurai to Rameswaram
  • Q. BD special shall be turned out during night within
    A)30 meters
    B)25 meters
    C)45 meters
    D)None of these
    Answer: 45 meters
  • Q. Maximum impact speed when shunting a single roller bearing fitted stock must be?
    A)5 kmph
    B)3 kmph
    C)4 kmph
    D)6 kmph
    Answer: 5 kmph

Leave a Comment